OPTIMASI RANCANGAN DESAIN PIT 2 BANKO BARAT BERDASARKAN BATAS WILAYAH KERJA DENGAN MEMPERHITUNGKAN FLUKTUASI HARGA BATUBARA DI PT BUKIT ASAM TBK. UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN

SAZ, AHMAD NAZHIR ASYAM and Puspita, Mega and Oktarinasari, Eva (2025) OPTIMASI RANCANGAN DESAIN PIT 2 BANKO BARAT BERDASARKAN BATAS WILAYAH KERJA DENGAN MEMPERHITUNGKAN FLUKTUASI HARGA BATUBARA DI PT BUKIT ASAM TBK. UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282126080_COVER.jpeg]
Preview
Image
RAMA_31201_03021282126080_COVER.jpeg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (267kB) | Preview
[thumbnail of RAMA_31201_03021282126080.pdf] Text
RAMA_31201_03021282126080.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (29MB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_TURNITIN.pdf] Text
RAMA_31201_03021282126080_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_01_front_ref.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (5MB)
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_02.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_03.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_04.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_05.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (459kB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_06_ref.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (126kB) | Request a copy
[thumbnail of RAMA_31201_03021282126080_0005039303_0015109006_07_lamp.pdf] Text
RAMA_31201_03021282126080_0005039303_0015109006_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy

Abstract

Fluctuations in coal prices pose a challenge for companies in optimizing the economic value of mining operations. In response, PT Bukit Asam Tbk has proposed two new boundaries for the design of a new pit in Pit 2 Banko. This study aims to design a new pit based on the proposed boundaries, plan the forecast of excavation and hauling equipment to determine the annual production until the end of mine life, and evaluate the net profit margin of the two new pit designs. The incremental pit expansion method was applied in the optimization of Pit 2 Banko, as its trial and error concept is effective in addressing both of these challenges. Annual production figures were derived from the productivity calculations of excavation and hauling equipment, which then allowed for the calculation of the net profit margin based on cash flow analysis. The results show that boundary A involves the removal of 96,371,408 bcm of overburden and yields 27,802,527 tons of coal, while Boundary B involves the removal of 144,814,008 bcm of overburden and yields 33,755,624 tons of coal. Operations are conducted using 10 overburden fleets and 7 coal fleets, with an average annual production of 32.128.359 bcm of overburden and 9.263.028 tons of coal, while for boundary B, it is 36.191.058 bcm of overburden and 8.436.186 tons of coal. The net profit margin is calculated at 11,30% for boundary A and 8,11% for boundary B. Based on these results, the pit design for Boundary A is suitable for advancement to the feasibility study stage, while the design for Boundary B may proceed to feasibility studies with more stringent evaluation.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: optimasi pit
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Ahmad Nazhir Asyam Saz
Date Deposited: 05 Aug 2025 05:13
Last Modified: 05 Aug 2025 05:13
URI: http://repository.unsri.ac.id/id/eprint/182242

Actions (login required)

View Item View Item