EVALUASI SISTEM PENERANGAN DAN PEMAKAIAN ENERGI DI KANTOR SATUAN BRIMOB TALANG KELAPA PALEMBANG

ARIATI, FIRDA and Alwani, Hairul (2019) EVALUASI SISTEM PENERANGAN DAN PEMAKAIAN ENERGI DI KANTOR SATUAN BRIMOB TALANG KELAPA PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_20201_03041181520011_0022095702.pdf] Text
RAMA_20201_03041181520011_0022095702.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_Turnitin.pdf] Text
RAMA_20201_03041181520011_0022095702_Turnitin.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_01_FRONT_REF.pdf] Text
RAMA_20201_03041181520011_0022095702_01_FRONT_REF.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_20201_03041181520011_0022095702_02.pdf] Text
RAMA_20201_03041181520011_0022095702_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_03.pdf] Text
RAMA_20201_03041181520011_0022095702_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (458kB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_04.pdf] Text
RAMA_20201_03041181520011_0022095702_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_05.pdf] Text
RAMA_20201_03041181520011_0022095702_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (89kB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_06_REF.pdf] Text
RAMA_20201_03041181520011_0022095702_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (195kB) | Request a copy
[thumbnail of RAMA_20201_03041181520011_0022095702_07_LAMP.pdf] Text
RAMA_20201_03041181520011_0022095702_07_LAMP.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

In Indonesia, we can see that there are so many offices that have been established, coupled with the increasing development of new infrastructure. This can also cause an increase in energy consumption. One of the causes of increasing electricity consumption is lighting systems in offices that are not in accordance with the Indonesian National Standard (SNI). Not only can it increase energy consumption but it can also cause discomfort. In this study aims to evaluate the lighting system in the office and calculate the amount of electricity used in the office before and after evaluation. This research was carried out at the Units of the Coconut Shell BRIMOB Palembang. At the Talang Kelapa BRIMOB Unit Office there are 17 rooms that use the type of CFL lamp (Compact Fluorescent Lamp) with a power of 45 watts, 20 watts, 24 watts, 32 watts, 27 watts, 25 watts and a type of lamp TL (Luminescent Tube) with power 36 watt. After conducting research in each room in the office where the lighting system is in accordance with the Indonesian National Standard (SNI) there are 5 rooms, namely the pasimin room with 1048.20 lux lighting, the guest waiting room is 635.34 lux, corridor 1 is 144 lux, corridor 2 amounting to 115 lux, terrace at 61 lux. The total electricity consumption by the lighting system prior to evaluation is 775.05 kWh / month and after re-planning using LED lights of 601.32 kWh / month. This study also uses the Dialux Application with type DN130B Coreline Downlight, GreenSpace DN472B, and GreenSpace DN463B lamps that are obtained at 460.14 kWh / month

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Electrical energy, lighting intensity, Indonesian National Standard (SNI), LED, Dialux Application.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: 03-Faculty of Engineering > 20201-Electrical Engineering (S1)
Depositing User: Users 836 not found.
Date Deposited: 07 Aug 2019 02:53
Last Modified: 07 Aug 2019 02:53
URI: http://repository.unsri.ac.id/id/eprint/2492

Actions (login required)

View Item View Item