EVALUASI KINERJA UNIT PEREMUK BATUBARA (CRUSHING PLANT) DALAM UPAYA PENCAPAIAN TARGET PRODUKSI CRUSHED COAL DI INTERMEDIATE STOCKPILE KM 107 PT SERVO LINTAS RAYA (TITAN GROUP), MUARA ENIM, SUMATERA SELATAN

NURZULLA, KARELLA SHOVIA and Arief, A.Taufik and Bochori, Bochori (2020) EVALUASI KINERJA UNIT PEREMUK BATUBARA (CRUSHING PLANT) DALAM UPAYA PENCAPAIAN TARGET PRODUKSI CRUSHED COAL DI INTERMEDIATE STOCKPILE KM 107 PT SERVO LINTAS RAYA (TITAN GROUP), MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621103.pdf] Text
RAMA_31201_03021381621103.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_TURNITIN.pdf] Text
RAMA_31201_03021381621103_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12MB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381621103_0009096303_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_02.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (551kB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_03.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (516kB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_04.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (906kB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_05.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (187kB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_06_ref.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (184kB) | Request a copy
[thumbnail of RAMA_31201_03021381621103_0009096303_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381621103_0009096303_0025107401_07_lamp.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Servo Lintas Raya adalah perusahaan swasta nasional di bawah naungan Titan Group yang bergerak di bidang pengangkutan dan penjualan batubara. PT. Servo Lintas Raya ini menjual produk berupa batubara yang telah dilakukan crushing (crushed coal). PT. Servo Lintas Raya ini memiliki jalan angkut batubara sendiri sepanjang 110 km, jalan itu membentang di tiga kabupaten, yakni Lahat, Muara Enim dan Palembang. Terdapat 3 intermediate stockpile yang terletak di km 107, 36 dan 0. Permasalahan yang terjadi adalah produksi unit crushing plant di intermediate stockpile km 107 belum secara optimal tercapai dikarenakan kinerja dari unit crushing plant sering mengalami hambatan, agar produksi crushed coal yang telah ditentukan oleh perusahaan dapat terpenuhi, maka diperlukan evaluasi terhadap kinerja unit crushing plant. Hasil penghitungan diketahui bahwa waktu kerja efektif di unit crushing plant sebesar 349,98 jam dari waktu tersedia 720 jam dengan efisiensi kerja sebesar 51 %. Berdasarkan perhitungan ketersediaan unit crushing plant, didapatkan nilai Mechanical Availability (MA) 93,12%, Physical Availability (PA) 96,2%, Use of Availability (UA) 53,42%. Dari hasil pengamatan dan perhitungan yang dilakukan, didapatkan produksi di bulan September 2019 adalah sebesar 103,050.52 ton/bulan. Hambatan-hambatan yang terjadi di unit crushing plant berupa hambatan mekanis dan hambatan non mekanis.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Crushing, Production, Obstacles
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures > TN295.U4 Coal--Drying. Drying apparatus
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 7169 not found.
Date Deposited: 11 Aug 2020 04:45
Last Modified: 11 Aug 2020 04:45
URI: http://repository.unsri.ac.id/id/eprint/32676

Actions (login required)

View Item View Item