EVALUASI TEKNIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUAN GAMPING UNIT PALIMANAN DI PT INDOCEMENT TUNGGAL PRAKARSA Tbk, CIREBON

ARIFIN, ZAINAL and Toha, M Taufik and Suwardi, Fuad Rusydi (2021) EVALUASI TEKNIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUAN GAMPING UNIT PALIMANAN DI PT INDOCEMENT TUNGGAL PRAKARSA Tbk, CIREBON. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181621007.pdf] Text
RAMA_31201_03021181621007.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_TURNITIN.pdf] Text
RAMA_31201_03021181621007_8864000016_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181621007_8864000016_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021181621007_8864000016_03.pdf] Text
RAMA_31201_03021181621007_8864000016_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (332kB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_02.pdf] Text
RAMA_31201_03021181621007_8864000016_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (243kB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_04.pdf] Text
RAMA_31201_03021181621007_8864000016_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (368kB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_05.pdf] Text
RAMA_31201_03021181621007_8864000016_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (185kB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_06_ref.pdf] Text
RAMA_31201_03021181621007_8864000016_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (195kB) | Request a copy
[thumbnail of RAMA_31201_03021181621007_8864000016_07_lamp.pdf] Text
RAMA_31201_03021181621007_8864000016_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (278kB) | Request a copy

Abstract

Limestone mining in PT Indocement Tunggal Prakarsa, Tbk, located at West Palimanan village, subdistrict of Gempol, Cirebon. The process of limestone transport from quarry B160 to crusher P9 is 1,78 km away, so mine road of limestone has an important role in supporting hauling activities. The repair of the road geometry include the addition of a wide road conditions to be standard, addition of a different height to produce a cross slope and superelevasi standards. Segment B-C and E-F on straight condition requires the addition of the road width as the standard 16,7 m, while the segment C-D, and D-E on bend conditions requires the addition of road width be a 19.87 m. The road grade that exceeds the maximum grade in a state of decline by -8%, namely in the H-I segment, I-J segment, J-K segment, and K-L segment. High difference that should be made to produce a cross slope standard is 0,33 m while the actual height difference in each segment of the straight road conditions does not meet the standard and cross slope not clear. As for the superelevasi standard, superelevasi each segment of the haul road has not yet met the standards so requires the addition of a high difference of 0.1 m with a height difference of 1.98 m. to make road conditions standards so can make the limestone hauling productivity on 1 fleet increased 1.861,07 tons/day to 2.2238,115tons/day.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Geometri Jalan, Produktivitas, Cross Slope, Superelevasi.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 13166 not found.
Date Deposited: 26 Jul 2021 03:45
Last Modified: 26 Jul 2021 03:45
URI: http://repository.unsri.ac.id/id/eprint/50117

Actions (login required)

View Item View Item