ANALISIS IMPLEMENTASI SMK3 DAN STRATEGI DALAM UPAYA PENINGKATAN KESELAMATAN KERJA DI PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Transmisi 500kV Paket 3 Muara Enim – New Aur Duri Zona 1 dan 2)

JOHAN, WENDI AGUSTIAN and Fitriani, Heni (2022) ANALISIS IMPLEMENTASI SMK3 DAN STRATEGI DALAM UPAYA PENINGKATAN KESELAMATAN KERJA DI PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Transmisi 500kV Paket 3 Muara Enim – New Aur Duri Zona 1 dan 2). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011381722159.pdf] Text
RAMA_22201_03011381722159.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011381722159_0006057901_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (705kB) | Preview
[thumbnail of RAMA_22201_03011381722159_0006057901_02.pdf] Text
RAMA_22201_03011381722159_0006057901_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (311kB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_03.pdf] Text
RAMA_22201_03011381722159_0006057901_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (289kB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_04.pdf] Text
RAMA_22201_03011381722159_0006057901_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_05.pdf] Text
RAMA_22201_03011381722159_0006057901_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (33kB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_06_ref.pdf] Text
RAMA_22201_03011381722159_0006057901_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (96kB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_0006057901_07_lamp.pdf] Text
RAMA_22201_03011381722159_0006057901_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011381722159_TURNITIN.pdf] Text
RAMA_22201_03011381722159_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12MB) | Request a copy

Abstract

This research study have purpose to get know about implementation of Occupational Health and Safety Management System (OHSMS) in Project of The Transmission 500kV Packet 3 Muara Enim – New Aur Duri Zone 1 and 2 along with the strategy to increase occupational safety effectively. Based on Government Regulation Number 50 year of 2012, the result of study research in the project is 88,76% which means Waskita Karya Company deserve to get gold flag appreciation. For the result research study of strategy to increase occupational safety get the biggest rate 93,89% in management regulation, which means management regulation very effective to occupational safety rate based on respondent opinion.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Implementasi, Keselamatan Kerja, SMK3, Strategi
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Wendi Agustian Johan
Date Deposited: 30 Aug 2022 03:10
Last Modified: 30 Aug 2022 03:10
URI: http://repository.unsri.ac.id/id/eprint/78051

Actions (login required)

View Item View Item