ANALISIS PERENCANAAN PONDASI BORED PILE PADA BOX UNDERPASS (STUDI KASUS JALAN TOL TRANS SUMATERA SP. INDRALAYA PRABUMULIH)

INDRIANI, CINDY and Dewi, Ratna (2022) ANALISIS PERENCANAAN PONDASI BORED PILE PADA BOX UNDERPASS (STUDI KASUS JALAN TOL TRANS SUMATERA SP. INDRALAYA PRABUMULIH). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011181823023.pdf] Text
RAMA_22201_03011181823023.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011181823023_0015067401_01_front_ref.pdf
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Preview
[thumbnail of RAMA_22201_03011181823023_0015067401_02.pdf] Text
RAMA_22201_03011181823023_0015067401_02.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_03.pdf] Text
RAMA_22201_03011181823023_0015067401_03.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_04.pdf] Text
RAMA_22201_03011181823023_0015067401_04.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_05.pdf] Text
RAMA_22201_03011181823023_0015067401_05.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (355kB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_06_ref.pdf] Text
RAMA_22201_03011181823023_0015067401_06_ref.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (592kB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_0015067401_07_lamp.pdf] Text
RAMA_22201_03011181823023_0015067401_07_lamp.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_22201_03011181823023_TURNITIN.pdf] Text
RAMA_22201_03011181823023_TURNITIN.pdf
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy

Abstract

PLANNING ANALYSIS OF BORED PILE FOUNDATION ON BOX UNDERPASSBOX UNDERPASS (CASE STUDY OF TRANS SUMATERA TOLL ROAD SP. INDRALAYA PRABUMULIH STA 5+362) Cindy Indriani1 , Ratna Dewi2 1 Jurusan Teknik Sipil dan Perencanaan, Fakultas Teknik, Universitas Sriwijaya 2 Dosen Jurusan Teknik Sipil dan Perencanaan, Fakultas Teknik, Universitas Sriwijaya (Jl. Raya Prabumulih - Km 32 Indralaya, Ogan Ilir, Sumsel) 1)Korespondensi Penulis: cindyindrianindryn@gmail.com Abstrak In the implementation of a construction the most important thing to note is the structure of the construction itself. A construction whose work floor or subgrade does not have sufficient bearing capacity to carry the load or the soil has a depth deep enough to reach the permitted soil to support the construction above it, then pile foundations are usually used. The purpose of this study was to determine the carrying capacity of single piles or groups by using bored pile foundation planning which must be able to support the load to a predetermined safety limit. The analysis carried out was planning the bored pile foundation, so that from the planning the dimensions and number of bored pile points were obtained. Pile foundation planning is calculated manually using the Reese and Wright method and in accordance with established regulations. The calculation stage begins with structural planning information, the forces acting on the foundation, determining the dimensions of the pile, calculating the number of foundation piles, pile group efficiency, bored pile reinforcement, determining pile cap thickness and pile cap reinforcement. From the results of the analysis, it was found that the number of bored pile foundations D60 cm was 70 piles with a concrete quality of 65 Mpa and D70 cm, the number of piles obtained was 60 piles with a concrete quality of 45 MPa. From the 2 alternative diameters of the bored pile, a diameter of 70 cm is taken with a total of 60 piles with a reinforcement specification of 20D38 and the stirrup used is d 12- 175 mm using SF or a safety factor of 2 in one pile group. This is based on the fact that the quality of the concrete used is smaller than the diameter of 60 cm, which means that the capacity of the material used will be smaller and the volume of make-up of the number of poles used is less so that it can save processing time and contraction costs incurred. Keywords: Bored pile, bearing capacity, SPT, Pile Cap

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Bored pile, Kapasitas Dukung, SPT, Pile Cap
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA703-712 Engineering geology. Rock mechanics. Soil mechanics.Underground construction
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Cindy Indriani
Date Deposited: 10 Oct 2022 04:11
Last Modified: 10 Oct 2022 04:11
URI: http://repository.unsri.ac.id/id/eprint/80586

Actions (login required)

View Item View Item