DESAIN PIT PENAMBANGAN LIMESTONE DENGAN TARGET PRODUKSI 1.248.000 TON PADA IUP OPERASI PRODUKSI BATURAJA 2 DI PT. SEMEN BATURAJA (PERSERO) TBK, SUMATERA SELATAN

KELANA, WAHYU JAYA and Toha, Taufik and Sudarmono, Djuki (2019) DESAIN PIT PENAMBANGAN LIMESTONE DENGAN TARGET PRODUKSI 1.248.000 TON PADA IUP OPERASI PRODUKSI BATURAJA 2 DI PT. SEMEN BATURAJA (PERSERO) TBK, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

This is the latest version of this item.

[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_01_front.pdf]
Preview
Text
RAMA_31201_03021181520002_8864000016_0024055301_01_front.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Preview
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_02.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (893kB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_03.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (337kB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_04.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (707kB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_05.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (183kB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_06ref.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_06ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (289kB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_8864000016_0024055301_07lamp.pdf] Text
RAMA_31201_03021181520002_8864000016_0024055301_07lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181520002_TURNITIN.pdf] Text
RAMA_31201_03021181520002_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181520002.pdf] Text
RAMA_31201_03021181520002.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Semen Baturaja (Persero) Tbk is a company engaged in cement manufacturing. The company wants to increase the amount of limestone production by creating new pit in Pusar Village, East Baturaja District, South Sumatra, namely Baturaja pit 2. There needs to be a pit design so mining can be carried better. By processing borehole data, topography, and others that have been obtained into block models, pit designs can be made with the help of surpac 6.3 software. The method used to determine the total carbonate in the block model is inverse distance method. The pit design is made by the final total production of 1,248,000 tons in the first year. The production divided into four pit designs. The pit design was made using the trial and error method until the production target and the total carbonate was reached with a minimum total carbonate 79%. The production and total carbonate in each pit are reported in the form of a report on the block model with the pit constraint itself. The final result of the pit is the limestone tonnage of 1,392,137 tons with 79.4% of total carbonate and overburden production of 395,250 tons

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Surpac, Block model, Total karbonat
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 2257 not found.
Date Deposited: 07 Oct 2019 01:50
Last Modified: 07 Oct 2019 01:50
URI: http://repository.unsri.ac.id/id/eprint/10296

Available Versions of this Item

Actions (login required)

View Item View Item