MAHMUDDIN, MULTASYAM IBNU SAPA and Susanti, Betty (2023) MANAJEMEN RISIKO TAHAP KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG BERTINGKAT (STUDI KASUS ASRAMA HAJI TRANSIT DI KOTA MAMUJU PROVINSI SULAWESI BARAT). Undergraduate thesis, Sriwijaya University.
Text
RAMA_22201_03011181924147.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (35MB) | Request a copy |
|
Text
RAMA_22201_03011181924147_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (541kB) |
|
Text
RAMA_22201_03011181924147_0004018001_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (384kB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (80kB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (444kB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (51kB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (192kB) | Request a copy |
|
Text
RAMA_22201_03011181924147_0004018001_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (34MB) | Request a copy |
Abstract
High-rise building construction projects have a very high level of risk. Factors such as large work weights and complex building structure designs are the main causes. Risks that occur will have an impact on cost and time aspects, cost and time aspects are the two most impactful aspects in construction projects. It can also cause direct losses for the contractor. Risk can be reduced through a systematic risk analysis approach. The main objective of risk management is to reduce the impact arising from these risks. The case study in this research is the Hajj Transit Dormitory Building Construction Project in Mamuju City, West Sulawesi Province. The project has considerable potential for risk, where the project has a large work weight, multistorey building design, and a considerable level of workmanship complexity. The method used is Severity Index. The results showed that there were 47 risks identified. The dominant risk factor to time is the risk of uncertain weather, while the dominant risk factor affecting cost is the risk of design changes.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Risk Identification, Dominant Risk, Risk Mitigation |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Multasyam Ibnu Sapa Mahmuddin |
Date Deposited: | 12 Jul 2023 08:12 |
Last Modified: | 12 Jul 2023 08:12 |
URI: | http://repository.unsri.ac.id/id/eprint/116191 |
Actions (login required)
View Item |