ANALISIS WAKTU PERENCANAAN PENJADWALAN DAN KONSEP CADANGAN WAKTU PROYEK DENGAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (STUDI KASUS : PEMBANGUNAN GEDUNG BANK MANDIRI DI PALEMBANG)

SETIAWAN, BOBBY and Juliantina, Ika and Rozirwan, Rozirwan (2013) ANALISIS WAKTU PERENCANAAN PENJADWALAN DAN KONSEP CADANGAN WAKTU PROYEK DENGAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (STUDI KASUS : PEMBANGUNAN GEDUNG BANK MANDIRI DI PALEMBANG). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03091001058.pdf] Text
RAMA_22201_03091001058.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (55MB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_01_front_ref.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (5MB)
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_02.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_03.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_04.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_05.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (647kB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_06_ref.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (432kB) | Request a copy
[thumbnail of RAMA_22201_03091001058_0001076005_0021057908_07_lamp.pdf] Text
RAMA_22201_03091001058_0001076005_0021057908_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (28MB) | Request a copy
Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Proyek pembangunan, Metode precedence diagram method (PDM)
Subjects: T Technology > TH Building construction > TH1-9745 Building construction
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 21 Jul 2023 05:12
Last Modified: 21 Jul 2023 05:12
URI: http://repository.unsri.ac.id/id/eprint/119161

Actions (login required)

View Item View Item