EVALUASI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN TARGET PRODUKSI BATUBARA DI PT.BARA PERMATA MINING,MEKAR JADI,KECAMATAN SUNGAI LILIN,KABUPATEN MUSI BANYUASIN,SUMATERA SELATAN

LARASATY, NYAYU SHINTYA INDAH and Asof, Marwan (2023) EVALUASI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN TARGET PRODUKSI BATUBARA DI PT.BARA PERMATA MINING,MEKAR JADI,KECAMATAN SUNGAI LILIN,KABUPATEN MUSI BANYUASIN,SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621071.pdf] Text
RAMA_31201_03021381621071.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_TURNITIN.pdf] Text
RAMA_31201_03021381621071_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_01_Front_ref.pdf] Text
RAMA_31201_03021381621071_0011115805_01_Front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021381621071_0011115805_02.pdf] Text
RAMA_31201_03021381621071_0011115805_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (205kB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_03.pdf] Text
RAMA_31201_03021381621071_0011115805_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (640kB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_04.pdf] Text
RAMA_31201_03021381621071_0011115805_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_05.pdf] Text
RAMA_31201_03021381621071_0011115805_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (147kB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_06_ref.pdf] Text
RAMA_31201_03021381621071_0011115805_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (215kB) | Request a copy
[thumbnail of RAMA_31201_03021381621071_0011115805_07_lamp.pdf] Text
RAMA_31201_03021381621071_0011115805_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Bara Permata Mining merupakan salah satu kontraktor perusahaan tambang batubara yang terletak di desa Mekar jadi Kecamatan Sungai Lilin, kabupaten Musi Banyuasin.Sumatera Selatan. Sistem Penambangan yang diterapkan di PT. Bara Permata Mining menggunakan sistem tambang terbuka dengan bentuk kegiatan penambangan menggunakan metode konvesional, kegiatan penambangan yang dilakukan di PT. Bara Permata Mining meliputi pembersihan lahan (land clearing), pengupasan tanah penutup (stripping overburden), penggalian batubara (coal getting), pemuatan dan pengangkutan batubatara (digging dan hauling), serta penimbunan (dumping). PT. Bara Permata Mining memiliki target produksi sebanyak 175. 701 ton/bulan. Adapun alat gali muat yang digunakan untuk menunjang target produksi antara lain excavator Hitachi Zaxis 350 H pada fleet 1 berjumah 1 buah , Excavator Zaxis 470 LC pada fleet 2 berjumah 1 buah, serta dump truck hino 500 di fleet 1 berjumah 10 unit sedangkan pada fleet 2 berjumah 12 unit. hasil penelitian yang didapat berdasarkan perhitungan produktivitas alat gali muat excavator dan alat angkut dump truck mempunyai produktivitas masing-masing 83.210,35 ton/tahun untuk excavator Hitachi 350H, 118.787,28 ton/t bulan untuk excavator Hitachi 470LC, sedangkan untuk dump truck Hino 500 adalah 82.969,6 ton/bulan.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Sistem Penambangan, Kegiatan Penambangan, Produksi alat.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Nyayu Shintya Indah Larasaty
Date Deposited: 10 Aug 2023 03:24
Last Modified: 10 Aug 2023 03:24
URI: http://repository.unsri.ac.id/id/eprint/126819

Actions (login required)

View Item View Item