ANALISIS PRODUKTIVITAS ALAT BOR DALAM MEMENUHI KEBUTUHAN 130 LUBANG LEDAK PERHARI DI PT SEMEN BATURAJA TBK KABUPATEN OGAN KOMERING ULU, PROVINSI SUMATERA SELATAN

WIBOWO, MUHAMAD SADDAM and Puspita, Mega and Waristian, Harry (2023) ANALISIS PRODUKTIVITAS ALAT BOR DALAM MEMENUHI KEBUTUHAN 130 LUBANG LEDAK PERHARI DI PT SEMEN BATURAJA TBK KABUPATEN OGAN KOMERING ULU, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924058.pdf] Text
RAMA_31201_03021281924058.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_TURNITIN.pdf] Text
RAMA_31201_03021281924058_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_01_front_ref.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB)
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_02.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (244kB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_03.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (256kB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_04.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (186kB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_05.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (38kB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_06_ref.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (112kB) | Request a copy
[thumbnail of RAMA_31201_03021281924058_0005039303_0014058902_07_lamp.pdf] Text
RAMA_31201_03021281924058_0005039303_0014058902_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Semen Baturaja Tbk. Merupakan perusahaan Badan Usaha Milik Negara (BUMN) yang bergerak di bidang pertambangan dengan bahan galian batu kapur dan clay yang berlokasi di Kota Baturaja, Kabupaten Ogan Komering Ulu, Provinsi Sumatera Selatan. Pada kegiatan produksi batu kapur, dilakukan kegiatan pengeboran dan peledakan sebagai tahapan pembongkaran material. Dalam kegiatan pengeboran batu kapur pada pit Tambang BTA 1 target lubang ledak yang harus dipenuhi dalam setiap harinya sebesar 130 lubang namun pada kegiatan pengeboran harian target tersebut tidak tercapai karena nilai efisiensi kerja alat bor sangat rendah yaitu hanya sebesar 55,35% dan 49,79%. Tujuan dari penelitian ini antara lain untuk menghitung nilai produktivitas aktual alat bor serta lubang ledak yang dapat dihasilkan per hari, menganalisis nilai performance alat bor, dan menganalisis upaya peningkatan jumlah lubang ledak yang dihasilkan oleh alat bor. Hasil dari penelitian ini yaitu didapatkan produktivitas aktual alat bor Furukawa PCR 200 C-45 sebesar 174 m/hari dan PCR 200 C-49 sebesar 217,6 m/hari serta total masing-masing lubang yang dapat dihasilkan sebanyak 40 dan 43 lubang. Setelah dilakukan upaya peningkatan jumlah lubang ledak yang dapat dihasilkan dengan menambahkan target lubang ledak sebanyak 65 lubang per hari, didapatkan nilai kecepatan pengeboran sebesar 0,86 meter/menit dan 1,10 meter/menit dengan cycle time yang direkomendasikan masing-masing sebesar 5,01 menit dan 4,58 menit.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pengeboran, Produktivitas, Efisiensi Kerja
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Muhamad Saddam Wibowo
Date Deposited: 16 Aug 2023 07:49
Last Modified: 16 Aug 2023 07:49
URI: http://repository.unsri.ac.id/id/eprint/127264

Actions (login required)

View Item View Item