ANALISIS EKSPERIMENTAL DAN SIMULASI PERALATAN PENAMBANGAN UNTUK OPTIMASI COST PER BCM DAN COST PER TON DI PT TRIARYANI MENGGUNAKAN SOFTWARE HAULSIM

ARDIANTO, NIKO and Amin, Muhammad and Waristian, Harry (2023) ANALISIS EKSPERIMENTAL DAN SIMULASI PERALATAN PENAMBANGAN UNTUK OPTIMASI COST PER BCM DAN COST PER TON DI PT TRIARYANI MENGGUNAKAN SOFTWARE HAULSIM. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181924015.pdf] Text
RAMA_31201_03021181924015.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_TURNITIN.pdf] Text
RAMA_31201_03021181924015_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_01_front_ref.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB)
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_02.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_03.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_04.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_05.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (291kB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_06_ref.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (353kB) | Request a copy
[thumbnail of RAMA_31201_03021181924015_0018085815_0014058902_07_lamp.pdf] Text
RAMA_31201_03021181924015_0018085815_0014058902_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

PT Triaryani is a company engaged in coal mining located in the Nibung District and Rawas Ilir District, North Musi Rawas Regency, South Sumatra Province. In mining activities the existence of mechanical equipment plays an important role. Often the use of hauling equipment is not as planned so that it will hamper production activities. The purpose of this research is to optimize mechanical equipment with the help of Haulsim software. With the help of software researchers can simulate mining activities by comparing the results of each fleet with the use of different numbers of dump trucks. The results compared are in terms of costs incurred during the simulation which include operating costs, owning costs and production generated in each fleet so that the optimal number of dump trucks used in each fleet is obtained. For fleet 1 with a distance of 1 km using 5 dump trucks. Fleets 2 and 3 with distances of 1.25km and 1.5km use 6 dump trucks. Fleet 4 with a distance of 1.75km uses 7 dump trucks and fleet 5 with a distance of 1.65km uses 5 dump trucks. After getting the optimal number of dump trucks, further simulations are carried out to analyze the costs incurred during production activities. So that the cost to move 1 bcm of overburden is Rp.10,123.69 and the cost to move 1 ton of coal is Rp20,851.4

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Optimalisasi alat, Alat Angkut, Produksi, Simulasi, Haulsim
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Niko Ardianto
Date Deposited: 08 Nov 2023 07:41
Last Modified: 08 Nov 2023 07:41
URI: http://repository.unsri.ac.id/id/eprint/130433

Actions (login required)

View Item View Item