LIARI, IMAM AKBAR and Arief, Taufik and Iskandar, Hartini (2019) EVALUASI DAN OPTIMASI KINERJA MESIN BOR FURUKAWA HCR 1500-D20II DALAM UPAYA PENYEDIAAN LUBANG LEDAK DI KUARI XII PT. HOLCIM INDONESIA SITE NUSAKAMBANGAN CILACAP. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021381520100.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (12MB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_01_FRONT_REF.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
|
Text
RAMA_31201_03021381520100_0009096303_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (711kB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (311kB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (447kB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (181kB) | Request a copy |
|
Text
RAMA_31201_03021381520100_0009096303_06_REF.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (380kB) |
|
Text
RAMA_31201_03021381520100_0009096303_LAMP.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
Abstract
PT Holcim Indonesia Tbk has a new limestone production target of 5 million tons in 2019, this target is different from the previous year which was only 3.5 million tons. Increased production targets require companies to evaluate the performance of drill tools and analyze factors that can hinder drilling activities. The purpose of this study is to determine the barriers to drilling performance and optimization efforts that must be made to meet the new production target in 2019. The research was conducted in the Nusakambangan quarry area. The actual drill productivity for January 2019 was 6309 tons / day while the daily drilling production target was 17,361 tons / day. The factors that influence the performance of the drill in January 2019 are the drilling speed is not optimal, the equivalent volume is not according to plan, the work efficiency of the drill bit is small and the lack of supervision when drilling activities take place. by increasing the work efficiency of the drill tool, increasing drilling speed, and strict supervision of drilling activities including the determination of drill hole points, the productivity of drill tools increased to 17,872 tons / day which has met the 17,361 tons / day daily production target .
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Furukawa, Blasting Hole Drilling, Target, Volume. |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN950-997 Building and ornamental stones |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 487 not found. |
Date Deposited: | 01 Aug 2019 12:00 |
Last Modified: | 16 Aug 2019 03:18 |
URI: | http://repository.unsri.ac.id/id/eprint/1310 |
Actions (login required)
View Item |