EVALUASI KINERJA PRODUKSI ALAT GALI MUAT DAN ANGKUT PADA PENAMBANGAN BATUBARA DI MTBU PT BUKIT ASAM TBK, KABUPATEN MUARA ENIM, SUMATERA SELATAN

PRATAMA, YUDHA PRAMUDYA and Asof, Marwan and Bochori, Bochori (2023) EVALUASI KINERJA PRODUKSI ALAT GALI MUAT DAN ANGKUT PADA PENAMBANGAN BATUBARA DI MTBU PT BUKIT ASAM TBK, KABUPATEN MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381924078.pdf] Text
RAMA_31201_03021381924078.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_TURNITIN.pdf] Text
RAMA_31201_03021381924078_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_01_front_ref.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_02.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (298kB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_03.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (173kB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_04.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (525kB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_05.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9kB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_06_ref.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (104kB) | Request a copy
[thumbnail of RAMA_31201_03021381924078_0011115805_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381924078_0011115805_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (894kB) | Request a copy

Abstract

PT Bukit Asam, Tbk is a State-Owned Enterprise (BUMN) engaged in coal mining activities. The Mining Business License (IUP) owned by PT Bukit Asam Thk is located in Tanjung Enim, Lawang Kidul District, Muara Enim Regency, South Sumatra Province. The mining area of PT Bukit Asam Tbk, especially the Tanjung Enim Mining Unit is divided into three locations namely, the Air Laya Mine (TAL). Muara Tiga Besar (MTB), and West Banko. In an effort to achieve productivity in coal mining, inspection of the quality of the tools to be used, good care and maintenance is needed so that the tools can continue to work productively and effectively, besides that, relevant costs are also needed so that production remains under good control. Where in September, the company planned for overburden stripping activities of 516,938 BCM, while the realization in the field onlyachieved 485,210 BCM. In October, the company planned an overburden stripping activityof 595,247 BCM, while the realization in the field was only around 532,690 BCM. The limitations of the problem in this study only limit productivity with coal production targets and equipment requirements based on production and productivity targets as well as the cost of excavating and transporting coal at Muara Tiga Besar Utara PT Bukit Asam, Tbk Tanjung Enim. The tools used are the Komatsu PC 400 backhoe excavator with a capacityof 2.8-3.2 m3 and the Hino 500 FM 320 TI dump truck with a vessel capacity of 32.4 m³and the average coal hauling distance from the front to the coal stockpile is 2000 meters. The productivity value for excavators is 284.11 tons/hour and the productivity value for dump trucks is 33.60 tons/hour. Based on the production target and equipment productivity, 4 units of excavators and 29 units of dump trucks are needed. Factors that affect the efficiency of production work include work discipline factors, machine maintenance obstacle factors and weather resistance factors, with the planned work discipline factor being 55 minutes and the actual value being 215 minutes, the machine maintenance factor which lasts 12 minutes per day, and resistance to weather conditions is 71 minutes per day The cost for digging is IDR 3,841.70/ton according to equipment needs, transportation costs IDR 9,460/ton according to equipment needs, and the total cost is IDR 13,301.7/ton

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Produktifitas, Penambangan, Efisiensi Kerja, Alat-Alat Mekanis
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Yudha Pramudya Pratama
Date Deposited: 05 Dec 2023 01:39
Last Modified: 05 Dec 2023 01:39
URI: http://repository.unsri.ac.id/id/eprint/131776

Actions (login required)

View Item View Item