PERENCANAAN SEQUENCE PENAMBANGAAN BATUBARA TRIWULAN 1-4 TAHUN 2024 UNTUK MEMENUHI TARGET PRODUKSI 1.000.000 TON PIT KUNGKILAN PT LANGGENG DAYA AGRINDO DI LOKASI IUP PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.

ROSALINA, RAHMA and Arief, Taufik and Al Hadi, Alek (2023) PERENCANAAN SEQUENCE PENAMBANGAAN BATUBARA TRIWULAN 1-4 TAHUN 2024 UNTUK MEMENUHI TARGET PRODUKSI 1.000.000 TON PIT KUNGKILAN PT LANGGENG DAYA AGRINDO DI LOKASI IUP PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181924012.pdf] Text
RAMA_31201_03021181924012.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_TURNITIN.pdf] Text
RAMA_31201_03021181924012_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (20MB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_02.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (601kB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_03.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (479kB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_05.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (153kB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_04.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_06_ref.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (269kB) | Request a copy
[thumbnail of RAMA_31201_03021181924012_0009096303_0001069008_07_lamp.pdf] Text
RAMA_31201_03021181924012_0009096303_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT Langgeng Daya Agrindo is a mining contractor company operating in the IUP location of PT Budi Gema Gempita. In Muara Lawai Village, East Merapi, Lahat, South Sumatra. The pit managed by PT Langgeng Daya Agrindo is the kungkilan pit. In 2024 PT Langgeng Daya Agrindo set a coal production target of 1,000,000 tons with a maximum SR of 6 bcm/ton. A mining plan was made to support the predetermined production target. From the design made for the 2024 final pit, the amount of coal obtained is 1,009,522.44 tons and overburden of 5,752,235.57 bcm with SR 5.7 bcm/ton. In quarter 1, coal 224,357.66 tons and overburden 759,955.04 with SR 3.11 bcm/ton were obtained, quarter 2 coal 252,503.03 tons and overburden 1,125. 244.14 with SR 4.46 bcm/ton, quarter 3 obtained coal 255,589.34 tons and overburden 1,933,885.02 with SR 7.57 bcm/ton, and quarter 4 obtained coal 257,072.41 tons and overburden 1,933,151.37 with SR 7.52 bcm/ton. Tool planning in quarter 1 requires 1 fleet in January and an additional 1 fleet in February and March for overburden and 1 fleet for coal. Quarter 2 Requires 2 fleets in April May and an additional 1 fleet in June for overburden and 2 coal fleets. Quarter 3 Requires 3 fleets for overburden and 2 coal fleets. Quarter 4 Requires 3 fleets in October and an additional 1 fleet in November and December for overburden and 2 coal fleets.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: sequence, batubara, overburden, fleet.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Rahma Rosalina
Date Deposited: 14 Jan 2024 09:13
Last Modified: 14 Jan 2024 09:13
URI: http://repository.unsri.ac.id/id/eprint/138125

Actions (login required)

View Item View Item