ANALISIS FINANSIAL PENAMBAHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENINGKATKAN PRODUKSI BATUBARA DARI 1.000.000 MENJADI 2.000.000 TON/TAHUN DI PT GOLDEN GREAT BORNEO, KABUPATEN LAHAT, SUMATERA SELATAN

NARADELA, VIONA and Pebrianto, Rosihan and Puspita, Mega (2024) ANALISIS FINANSIAL PENAMBAHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENINGKATKAN PRODUKSI BATUBARA DARI 1.000.000 MENJADI 2.000.000 TON/TAHUN DI PT GOLDEN GREAT BORNEO, KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021382025090.pdf] Text
RAMA_31201_03021382025090.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_TURNITIN.pdf] Text
RAMA_31201_03021382025090_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_01_front_ref.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_02.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_03.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_04.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_05.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_06_ref.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025090_0010029003_0005039303_07_lamp.pdf] Text
RAMA_31201_03021382025090_0010029003_0005039303_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT GGB is one of the private companies engaged in coal mining located in Prabumenang Village, East Merapi District, Lahat Regency, South Sumatra Province. It is divided into 3 mining blocks, namely Zebra Block, Kijang Block, and North Block. However, currently, the company is operating in 2 pits, namely Zebra Block and North Block. Based on the feasibility study document, PT GGB Zebra Block with a Mining Business License (IUP) for production operations covering 359.16 hectares has proven reserves of 23,172,467 tons with a stripping ratio of 1:4.34, with plans to increase coal production from 1,000,000 tons per year to 2.000.000 tons per year in the Zebra Block. To achieve this target, the addition of excavation and transportation equipment is crucial to increase production capacity. In this regard, the method used is the equipment purchase method. The equipment purchase method involves investment components such as equipment purchase costs, operating costs, and ownership costs that will affect investment feasibility, such as Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period.From productivity calculations, the required number of Excavator Liugong CLG 952E units is 1, while the number of Dumptruck Quester CWE 37064R units required is 5. The total investment cost in 5 years is IDR 117.827.301.890, with details of equipment purchase costs for 1 units of Excavator Backhoe Liugong CLG 952E and 5 units of Dumptruck Quester CWE 37064R totaling IDR 12.124.750.000. The total Operating Cost is IDR 94.268.337.590, and the total Ownership Cost is IDR 11.434.214.300. The purchase of excavation and transportation equipment results in an NPV of IDR 47.665.079.897, an IRR of 98,62%, and a Payback Period of 1,01 years. From this feasibility analysis, it can be concluded that the investment in the purchase of excavation and transportation equipment is viable.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Investasi, Alat Berat, Kelayakan dan Analisis Kepekaan
Subjects: H Social Sciences > HG Finance > HG4001-4285 Finance management. Business finance. Corporation finance
H Social Sciences > HG Finance > HG4501-6051 Investment, capital formation, speculation
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Viona Naradela
Date Deposited: 25 Jan 2024 01:48
Last Modified: 25 Jan 2024 01:48
URI: http://repository.unsri.ac.id/id/eprint/139646

Actions (login required)

View Item View Item