ANALISIS PERBANDINGAN UNIT COST PENGUPASAN OVERBURDEN DI PIT 3 (SWAKELOLA) DAN PIT TSBC (NON-SWAKELOLA) DI PT BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN

NUGRAHA, EGIO HABIBIE and Bochori, Bochori and Puspita, Mega (2024) ANALISIS PERBANDINGAN UNIT COST PENGUPASAN OVERBURDEN DI PIT 3 (SWAKELOLA) DAN PIT TSBC (NON-SWAKELOLA) DI PT BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381924097.pdf] Text
RAMA_31201_03021381924097.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_TURNITIN.pdf] Text
RAMA_31201_03021381924097_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_01_front_ref.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (396kB)
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_02.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (159kB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_03.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (171kB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_04.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (502kB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_05.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (46kB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_06_ref.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (94kB) | Request a copy
[thumbnail of RAMA_31201_03021381924097_0025107401_0005039303_07_lamp.pdf] Text
RAMA_31201_03021381924097_0025107401_0005039303_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (527kB) | Request a copy

Abstract

PT Bukit Asam as owener does mining it self at they mining business permit area or called self-management method, apart from that PT Bukit Asam Tbk. also made several agreements with various contractors, one of them is PT PAMA PERSADA or called non self-management method. Rental agreement made by PT Bukit Asam Tbk. and PT PAMA PERSADA using SPPH 10360 and SPPH 13025 contract. PT Bukit Asam as the self-management party in order to fulfill overburden production targets, then make an investment by purchasing equipment. This research was conducted to determine the unit cost of stripping overburden in pit 3 of Banko Barat Mining and in the Townsite Basecamp pit of Air Laya Mining, as well as to determine the comparison of the unit cost of overburden stripping carried out in pit 3 (self-managed) and in the Townsite Basecamp pit (non-self-managed). Based on analysis and processing carried out using Microsoft Excel 2013, the results obtained were that the unit cost of overburden stripping in pit 3 was18.393,84 IDR/BCM and in TSBC pit was 48.000 IDR/BCM, and a ratio of 1 : 2.6 (one to two point six) which means that overburden stripping in pit 3 using the self-managed method costs less than in the TSBC pit using the non-self-managed method.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Swakelola, Unit cost, Pengupasan Overburden
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA177.4-185 Engineering economy
T Technology > TA Engineering (General). Civil engineering (General) > TA368.P37 Tolerance (Engineering) Cost control. Engineering design. Machining
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Egio Habibie Nugraha
Date Deposited: 31 Jan 2024 04:51
Last Modified: 31 Jan 2024 04:51
URI: http://repository.unsri.ac.id/id/eprint/140167

Actions (login required)

View Item View Item