KAJIAN PERBANDINGAN KINERJA PENGGALIAN BIJIH TIMAH MENGGUNAKAN KAPAL ISAP PRODUKSI TIMAH XV DENGAN KOMBINASI KAPAL ISAP STRIPPING PULAU 7 DAN KAPAL ISAP PRODUKSI TIMAH XV DI AREA PENAMBANGAN LAUT TEMPILANG PT TIMAH (PERSERO) TBK

VIVI, VIVI and Yusuf, Maulana and Iskandar, Hartini (2017) KAJIAN PERBANDINGAN KINERJA PENGGALIAN BIJIH TIMAH MENGGUNAKAN KAPAL ISAP PRODUKSI TIMAH XV DENGAN KOMBINASI KAPAL ISAP STRIPPING PULAU 7 DAN KAPAL ISAP PRODUKSI TIMAH XV DI AREA PENAMBANGAN LAUT TEMPILANG PT TIMAH (PERSERO) TBK. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181320027.pdf] Text
RAMA_31201_03021181320027.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (52MB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_01_front_ref.pdf] Text
RAMA_31201_03021181320027_0025095903_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (11MB)
[thumbnail of RAMA_31201_03021181320027_0025095903_02.pdf] Text
RAMA_31201_03021181320027_0025095903_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_03.pdf] Text
RAMA_31201_03021181320027_0025095903_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_04.pdf] Text
RAMA_31201_03021181320027_0025095903_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_05.pdf] Text
RAMA_31201_03021181320027_0025095903_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (930kB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_06_ref.pdf] Text
RAMA_31201_03021181320027_0025095903_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (645kB) | Request a copy
[thumbnail of RAMA_31201_03021181320027_0025095903_07_lamp.pdf] Text
RAMA_31201_03021181320027_0025095903_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy

Abstract

PT TIMAH (Persero) Tbk is one of the State Owned Enterprises (SOEs) in the field of tin mines located in the province of Bangka Belitung. Alluvial tin ore mining on the seabed is done using Dredger, cutter suction dredges, and Bucket Wheel Drage and Cutter Suction for stripping overburden. More emphasis tin ore mining production by using Cutter Suction Dredger. A layer of soil that is too thick and covering material resulting sludge, It causes the excavation become less efficient, and the operating costs of extracting and washing increase. The rate of transfer of land Cutter Suction Dredger of 200 m3 / h and the target hours of the road about 500 hours per month can not be achieved with good in these condition. Stripping Cutter Suction then need to be enabled to help excavate soil over a thick, so it can help the performance Cutter Suction Dredger in the process of excavation. Cutter Suction Stripping using a cutter to cut the layer of soil and then pump to suck soil and dispose of land that has been excavated. Stripping Cutter Suction Dredger combination has optimum soil excavation removal rate of 1050 m3 / h, so the Cutter Suction Dredger Stripping can help in increasing the productivity of the soil removal. Mining using a ship combination of better than mining ship without combinations. Combination vessel can also affect the cost of the mining operation. The total cost required for mining use a combination of the ship in a more efficient work plan of Rp. Rp 7.045.313.574,34. In other words, be saving about 37% of the cost of the mining operation without the combination.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: digging, Stripping, combination, LPT
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 22 Mar 2024 04:51
Last Modified: 22 Mar 2024 04:51
URI: http://repository.unsri.ac.id/id/eprint/142007

Actions (login required)

View Item View Item