PURBA, INTAN D. ANGELITA and Hadi, Alek Al and Puspita, Mega (2024) PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021282025078.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
|
Text
RAMA_31201_03021282025078_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (25MB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (482kB) |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (495kB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (581kB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (132kB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (147kB) | Request a copy |
|
Text
RAMA_31201_03021282025078_0001069008_0005039303_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
Abstract
In accordance with the calculation of economic value from the engineering department at PT Banjarsari Pribumi, it was obtained that the South SP Timur pit is an uneconomical pit to mine because it generates negative net income. However, in the effort of additional reserve opportunities and expansion of IPD South disposal capacity, in 2024 PT Banjarsari Pribumi plans to integrate with the South ABL pit. where in 2023 the South ABL pit has carried out overall overburden stripping and partial coal getting. To actualize these optimization activities, it requires a technical planning sequence and economic value of both pits and their integration. Technical sequence planning consists of pit design and disposal planning using Minescape 5.7 software and fleet number planning. For economic value is obtained from the value of fixed costs, production costs and sales results. Based on calculations with sample-polygon tools, the overburden volume is 3,226,809.29 bcm and an estimated coal tonnage is 667.805,29 tons with a stripping ratio (SR) value of 4,83. From the calculation of the economic value resulting from the integration results, a fixed cost value of IDR 84,015,220,792 was obtained; production costs of IDR 80,716,585,440.57; coal sales proceeds amounted to IDR 270,679,915,879.72; and sales profit of IDR 70,518,109,647.29.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Sequence, integrasi pit, disposal |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Intan D. Angelita Purba |
Date Deposited: | 26 Apr 2024 04:04 |
Last Modified: | 26 Apr 2024 04:04 |
URI: | http://repository.unsri.ac.id/id/eprint/143395 |
Actions (login required)
View Item |