PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN

PURBA, INTAN D. ANGELITA and Hadi, Alek Al and Puspita, Mega (2024) PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025078.pdf] Text
RAMA_31201_03021282025078.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_TURNITIN.pdf] Text
RAMA_31201_03021282025078_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (25MB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_01_front_ref.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (482kB)
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_02.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (495kB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_03.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (581kB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_04.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_05.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (132kB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_06_ref.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (147kB) | Request a copy
[thumbnail of RAMA_31201_03021282025078_0001069008_0005039303_07_lamp.pdf] Text
RAMA_31201_03021282025078_0001069008_0005039303_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

In accordance with the calculation of economic value from the engineering department at PT Banjarsari Pribumi, it was obtained that the South SP Timur pit is an uneconomical pit to mine because it generates negative net income. However, in the effort of additional reserve opportunities and expansion of IPD South disposal capacity, in 2024 PT Banjarsari Pribumi plans to integrate with the South ABL pit. where in 2023 the South ABL pit has carried out overall overburden stripping and partial coal getting. To actualize these optimization activities, it requires a technical planning sequence and economic value of both pits and their integration. Technical sequence planning consists of pit design and disposal planning using Minescape 5.7 software and fleet number planning. For economic value is obtained from the value of fixed costs, production costs and sales results. Based on calculations with sample-polygon tools, the overburden volume is 3,226,809.29 bcm and an estimated coal tonnage is 667.805,29 tons with a stripping ratio (SR) value of 4,83. From the calculation of the economic value resulting from the integration results, a fixed cost value of IDR 84,015,220,792 was obtained; production costs of IDR 80,716,585,440.57; coal sales proceeds amounted to IDR 270,679,915,879.72; and sales profit of IDR 70,518,109,647.29.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Sequence, integrasi pit, disposal
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Intan D. Angelita Purba
Date Deposited: 26 Apr 2024 04:04
Last Modified: 26 Apr 2024 04:04
URI: http://repository.unsri.ac.id/id/eprint/143395

Actions (login required)

View Item View Item