PERENCANAAN KOLAM RETENSI DI KAWASAN PUNTI KAYU DENGAN MENGGUNAKAN BANGUNAN PELIMPAH DAN PINTU AIR

PERMATASARI, SRIAYU and Amin, M. Baitullah Al and Yuono, Agus Lestari (2016) PERENCANAAN KOLAM RETENSI DI KAWASAN PUNTI KAYU DENGAN MENGGUNAKAN BANGUNAN PELIMPAH DAN PINTU AIR. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03121001023.pdf] Text
RAMA_22201_03121001023.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (111MB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_01_front_ref.pdf]
Preview
Text
RAMA_22201_03121001023_0024018601_0024056802_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Preview
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_02.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (347kB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_03.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (582kB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_04.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (692kB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_05.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (33kB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_06_ref.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15kB) | Request a copy
[thumbnail of RAMA_22201_03121001023_0024018601_0024056802_07_lamp.pdf] Text
RAMA_22201_03121001023_0024018601_0024056802_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (380kB) | Request a copy

Abstract

Flooding problems often occur in Indonesia's capital and surrounding areas. Just as in Palembang, South Sumatra Province which is a metropolitan city with a myriad of problems one of them like a flood. One of the causes of the flooding or water logging may include changes in land use where the total population is increasing. If the solution for problems like this can’t be found, then there will be other problems that could damage the ecosystem environment around puddles. With the increasingly widespread problem of flooding in the city of Palembang where especially around Kol. H. Burlian street, hence the need for the planned construction of retention ponds using spillway and sluice building. This study consists of several stages and using calculations modelling with the help of HEC HMS program. Where this modeling adjust the shape of catchment area which have been determined to find out how much area retention ponds and reservoirs are needed as well as the flow rate out of the retention ponds. Then the results of simulation modeling will be compared to manual calculation results that have been obtained previously. Based on the results of manual calculations in the form of direct runoff hydrograph obtained Qpeak value is at 16.00 m3 / sec. Retention pond has a planned area of 2.5 hectares or 25,000 m2 and a height of 5 m pool, so the retention pond has a catchment of 125,000 m3 and is assisted by using a spillway which has a width of 6 m is located at the elevation of 4.2 m from the bottom of the pond and 30 cm of above normal water level and water gates with a width of 2 m and a height of 3.3 m. From the results of this study showed that the presence of such planning the construction of retention ponds above can overcome the flooding problems that occurred in the vicinity of Kol. H. Burlian Street Palembang.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Retention pond planning, spillway building, HEC HMS
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA1-2040 Engineering (General). Civil engineering (General) > TA144 General works. Civil engineering, etc. Early to 1850
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Users 2701 not found.
Date Deposited: 06 Nov 2019 08:42
Last Modified: 25 Oct 2023 01:53
URI: http://repository.unsri.ac.id/id/eprint/15121

Actions (login required)

View Item View Item