KUNCORO, M. BAGUS and Mukiat, Mukiat (2017) EVALUASI KEHILANGAN WAKTU KERJA PRODUKTIF ALAT GALI MUAT DAN ALAT ANGKUT DALAM UPAYA MENINGKATKAN PRODUKSI BATUBARA DI PENAMBANGAN AIR LAYA SELATAN PT. BUKIT ASAM (PERSERO), Tbk. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03101402073_ 0022115801_02_.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (868kB) | Request a copy |
|
Text
RAMA_31201_03101402073_ 0022115801_03_.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (848kB) | Request a copy |
|
Text
RAMA_31201_03101402073_ 0022115801_04_.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (859kB) | Request a copy |
|
Text
RAMA_31201_03101402073_ 0022115801_05_.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (834kB) | Request a copy |
|
Text
RAMA_31201_03101402073_ 0022115801_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (71kB) | Request a copy |
|
Text
RAMA_31201_03101402073_ 0022115801_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (360kB) | Request a copy |
|
Preview |
Text
RAMA_31201_03101402073_ 0022115801_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (4MB) | Preview |
Abstract
Mining method used in coal mining PT. Bukit Asam (Persero), Tbk in mining areas, namely Air Laya Mining Method Open (Open Pit). Coal mining activities conducted in the mining area south Air Laya using conventional mining system is by using a combination excavator and excavator-unloading dump truck as a means of conveyance. Coal loading system to a dump truck using a top loading and loading position of coal use singgle truck backing up. Coal mining in PT. Bukit Asam (Persero), Tbk in Quarry Air Laya has a target production in March amounted to 327.000 tonnes. Digging tools fit in use PC400 excavator backhoe while conveyance used dump trucks scania P380. Real production generated by the combination of the work amounted to 229.580 tonnes for March, while the calculation of the theoretical production produced by excavator loading 305.515,44 tonnes, while for 7 units of dump trucks scania P380 amounted to 177.981,54-197.759,54 tonnes month. To achieve the goals of production per month, to evaluate the effective working time. Effective working time that is still possible to be increased with decrease or suppress their time barriers can be avoided. By pressing time constraints that can be avoided, it will cause an increase in the efficiency of work. Production can be produced by excavatorunload-ing after repair work time amounted to 344.759,44 tonnes, while for 7 unit dump truck scania P380 amounting 330.701,8 tonnes. Therefore, by minimizing the time constraints of existing production targets can be achieved.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | evaluation productive, effective working time, time constraints |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 2711 not found. |
Date Deposited: | 07 Nov 2019 06:42 |
Last Modified: | 07 Nov 2019 06:42 |
URI: | http://repository.unsri.ac.id/id/eprint/15186 |
Actions (login required)
View Item |