PRA RENCANA PABRIK PEMBUATAN METANOL KAPASITAS PRODUKSI 355.000 TON/TAHUN

SAING, WASTI and Hadiah, Fitri and Ali, Farida (2018) PRA RENCANA PABRIK PEMBUATAN METANOL KAPASITAS PRODUKSI 355.000 TON/TAHUN. Undergraduate thesis, University of Sriwijaya.

[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_01-front_ref.pdf]
Preview
Text
RAMA_24201_03031181320043_0022087801_ 0018115501_01-front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_02.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (622kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_03.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (233kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_04.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (109kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_05.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (399kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_06.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (492kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_07.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_07.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (352kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_08.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_08.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_09_ref.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_09_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (116kB) | Request a copy
[thumbnail of RAMA_24201_03031181320043_0022087801_ 0018115501_10_lamp.pdf] Text
RAMA_24201_03031181320043_0022087801_ 0018115501_10_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy

Abstract

Pabrik pembuatan Metanol berkapasitas 355.000 ton/tahun ini direncanakan didirikan pada tahun 2023 berlokasi di Kawasan Industri Sei Mangkei Kecamatan Bosar Maligas Kabupaten Simalungun, Sumatera Utara dengan luas area 12 Ha. Proses pembuatan Mengacu ini mengacu pada US Patent 9,505,689 B2. Reaksi berlangsung pada reaktor Fluidized Bed dan Fixed Bed Multitube, menggunakan katalis CuO, ZnO, dan Al2O3. Reaksi pada reaktor 01 berlangsung pada temperatur 230oC dengan tekanan 43 atm dan reaksi pada reaktor 02 berlangsung pada temperatur 250˚C dengan tekanan 50 atm. Untuk membangun dan mengoperasikan pabrik ini akan didirikan perusahaan berbentuk perseroan terbatas (PT) yang dipimpin oleh seorang Direktur Utama. Sistem organisasi perusahaan yang dipilih adalah line and staff dengan total karyawan 216 orang. Pabrik pembuatan Metanol ini layak didirikan karena telah memenuhi persyaratan parameter ekonomi sebagai berikut: - Annual Cash Flow : US $ 1,720,618,103.396 - Total Capital Investment (TCI) : US $ 2,970,000,453.115 - Total Production Cost : US $ 1,722,854,068.439 - Selling Price : US$ 3,711,011,492.95 - Net Profit After Tax : US $ 1,491,118,068.383 - Pay Out Time : 1,6 tahun - Rate Of Return On Investment : 59,07% - Break Event Point : 32,384% - Service Life : 11 tahun

Item Type: Thesis (Undergraduate)
Subjects: Q Science > Q Science (General) > Q1-295 General
Divisions: 03-Faculty of Engineering > 24201-Chemical Engineering (S1)
Depositing User: Mrs. Elly Suryani
Date Deposited: 11 Nov 2019 07:12
Last Modified: 11 Nov 2019 07:12
URI: http://repository.unsri.ac.id/id/eprint/15696

Actions (login required)

View Item View Item