ANALISIS PERENCANAAN TEKNIS SEQUENCE DESAIN PIT 2 BANKO BARAT DALAM MENCAPAI TARGET PRODUKSI TRIWULAN 1 PADA PT BUKIT ASAM TBK

NOVIANDRI, ROBERT and Toha, Muhammad Taufik and Oktarinasari, Eva (2024) ANALISIS PERENCANAAN TEKNIS SEQUENCE DESAIN PIT 2 BANKO BARAT DALAM MENCAPAI TARGET PRODUKSI TRIWULAN 1 PADA PT BUKIT ASAM TBK. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381924063.pdf] Text
RAMA_31201_03021381924063.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_TURNITIN.pdf] Text
RAMA_31201_03021381924063_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_01_front_ref.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_02.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (201kB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_03.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (452kB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_04.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (655kB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_05.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_06_ref.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (76kB) | Request a copy
[thumbnail of RAMA_31201_03021381924063_8864000016_0015109006_07_lamp.pdf] Text
RAMA_31201_03021381924063_8864000016_0015109006_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Bukit Asam, Tbk. merupakan perusahaan BUMN yang berkecimpung di sektor pertambangan batubara di Tanjung Enim, Sumatera Selatan. Perusahaan ini memiliki Izin Usaha Pertambangan (IUP) dengan luas area mencapai 40.347 hektar. Penelitian ini dilakukan dengan menganalisis serta mengumpulkan data lapangan yang aktual. Pengumpulan data lapangan melibatkan evaluasi cycle time untuk shovel PC 3000 dan truk angkut HD 785 yang aktif di Pit 2 Banko Barat PT. Bukit Asam TBK. Dalam konteks perencanaan pertambangan, seringkali diperlukan analisis untuk menilai sejauh mana pencapaian telah sesuai dengan rencana sebelumnya. Analisis ini melibatkan perencanaan urutan kegiatan, desain, dan kapasitas unit. Tujuan dari penelitian ini adalah untuk menilai perencanaan teknis sequence, mengidentifikasi hambatan dalam perencanaan sequence, mengevaluasi desain dengan memperhatikan geometri lereng yang aman dan stabil, serta merinci langkah-langkah yang diperlukan untuk mencapai target produksi. Rencana analisis awal perencanaan sequence mencakup pemindahan tanah penutup sebanyak 1.200.000 bcm dan ekstraksi batu bara sebanyak 210.000 ton. Namun, setelah dianalisis, data yang diperoleh menunjukkan bahwa jumlah tanah penutup adalah sebanyak 1.289.000 bcm dan produksi batu bara mencapai 320.000 ton

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Sequence, Overburden, coal, Produktivitas
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Robert Noviandri
Date Deposited: 30 Sep 2024 02:45
Last Modified: 30 Sep 2024 02:45
URI: http://repository.unsri.ac.id/id/eprint/158174

Actions (login required)

View Item View Item