ANALISIS KELAYAKAN EKONOMIS PENAMBANGAN BATUBARA DI EXTEND PIT PANDU I BERDASARKAN PENJADWALAN PRODUKSI MENGGUNAKAN SPRY 5.0 DI PT XYZ, MUSI BANYUASIN, SUMATERA SELATAN

ADIVA, ALVITO RIZKI and Bochori, Bochori and Cahyaningsih, Bimbi (2024) ANALISIS KELAYAKAN EKONOMIS PENAMBANGAN BATUBARA DI EXTEND PIT PANDU I BERDASARKAN PENJADWALAN PRODUKSI MENGGUNAKAN SPRY 5.0 DI PT XYZ, MUSI BANYUASIN, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025035.pdf] Text
RAMA_31201_03021282025035.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_TURNITIN.pdf] Text
RAMA_31201_03021282025035_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_01_front_ref.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_02.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (843kB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_03.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (651kB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_04.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_05.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (204kB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_06_ref.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (312kB) | Request a copy
[thumbnail of RAMA_31201_03021282025035_0025107401_0205069201_07_lamp.pdf] Text
RAMA_31201_03021282025035_0025107401_0205069201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT XYZ is located in Musi Banyuasin Regency, South Sumatra Province. In Pit Pandu I, mining activities have been completed or have reached the ultimate pit limit. In that pit, there are still coal reserves that have been submerged by water and mud found in the void. PT XYZ plans to extend Pit Pandu I and will undertake a mining project, so a technical and economic study is required before the project is carried out. This research aims to plan the mining schedule at Extend Pit Pandu I, analyze the economic feasibility of mining activities using the cash flow method, and analyze the economic criteria against the sensitivity of changes in coal selling prices and production costs. Based on the life of mine (LOM) design obtained from the mine engineer at PT XYZ, a mining schedule was created using the SPRY 5.0 software, and it was determined that coal and overburden production would be completed within 3 months, with a total coal production of 50,296 tons and overburden of 277,324 BCM. After that, the estimated number of mechanical equipment used was calculated. Based on the production scheduling that has been carried out, a cumulative cash flow of US$ 119,101 was obtained. The value is considered feasible and profitable for the company, while still taking into account the increase in coal selling prices and production costs, because a 15% decrease in coal selling prices and a 15% increase in production costs result in a negative cumulative cash flow.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: schedulling, SPRY 5.0, ekonomi, sensitivitas, batubara
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Alvito Rizki Adiva
Date Deposited: 02 Jan 2025 03:31
Last Modified: 02 Jan 2025 03:31
URI: http://repository.unsri.ac.id/id/eprint/162086

Actions (login required)

View Item View Item