EVALUASI PRODUKTIVITAS DAN BIAYA OPERASI PENGUPASAN OVERBURDEN DI PT BUMI SEKUNDANG ENIM ENERGY KABUPATEN PENUKAL ABAB LEMATANG ILIR SUMATERA SELATAN

WIJAYA, SATRIA and Puspita, Mega and Sari, Eva Oktarina (2024) EVALUASI PRODUKTIVITAS DAN BIAYA OPERASI PENGUPASAN OVERBURDEN DI PT BUMI SEKUNDANG ENIM ENERGY KABUPATEN PENUKAL ABAB LEMATANG ILIR SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924112.pdf] Text
RAMA_31201_03021281924112.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_TURNITIN.pdf] Text
RAMA_31201_03021281924112_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15MB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_01_front_ref.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_02.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (412kB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_03.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (144kB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_04.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (439kB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_05.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10kB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_06_ref.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7kB) | Request a copy
[thumbnail of RAMA_31201_03021281924112_0005039303_0015109006_07_lamp.pdf] Text
RAMA_31201_03021281924112_0005039303_0015109006_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT Bumi Sekundang Enim Energy is a member of the Baramulti group of companies engaged in mining. The working area of PT Bumi Sekundang Enim Energy Pit AB is divided into two parts: Pit AB and Pit C, with current operations focused on Pit AB. The method used is open pit mining. In May 2024, the planned production for overburden stripping activities in Pit AB is 332,829.17 BCM/month, while the actual realization is only 305,040 BCM/month, or about 91.65% of the targeted production plan. This research aims to evaluate the achievement of overburden production, identify constraints affecting production achievement, and assess efforts to improve overburden production. Field observations in Pit AB show that the actual productivity of the Komatsu PC400LC and Hino 500 FM 280JD is 685.12 BCM/hour and 410 BCM/hour, respectively. Factors affecting production achievement include low work efficiency. There are 16 obstacles impacting work efficiency. The effective working time achieved is 465.97 hours/month, with obstacles totaling 278.03 hours/month, leading to low work efficiency. Efforts have been made to minimize avoidable obstacles, such as loading queues, front preparation, and equipment warming. After addressing these avoidable obstacles, the total obstacle time was reduced to 165.04 hours/month. Based on calculations, the actual operating cost for overburden excavation and transportation is Rp8,395,628/hour, resulting in an overburden stripping cost based on actual productivity of Rp20,473/BCM. After evaluating the stripping costs based on ideal productivity, it amounts to Rp11,371/BCM.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: target produksi, produktivitas, biaya penambangan
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Satria Wijaya
Date Deposited: 07 Jan 2025 08:32
Last Modified: 07 Jan 2025 08:32
URI: http://repository.unsri.ac.id/id/eprint/162579

Actions (login required)

View Item View Item