ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN BETON PADA PROYEK BENDUNGAN TIGA DIHAJI PAKET II DI KABUPATEN OKU SELATAN

WIJAYANTI, PUSPITA RAHMA and Indriyati, Citra (2025) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN BETON PADA PROYEK BENDUNGAN TIGA DIHAJI PAKET II DI KABUPATEN OKU SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011282126047_Cover.jpg]
Preview
Image
RAMA_22201_03011282126047_Cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (401kB) | Preview
[thumbnail of RAMA_22201_03011282126047.pdf] Text
RAMA_22201_03011282126047.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_TURNITIN.pdf] Text
RAMA_22201_03011282126047_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_01_front_ref.pdf] Text
RAMA_22201_03011282126047_0014018106_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (9MB)
[thumbnail of RAMA_22201_03011282126047_0014018106_02.pdf] Text
RAMA_22201_03011282126047_0014018106_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_03.pdf] Text
RAMA_22201_03011282126047_0014018106_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_04.pdf] Text
RAMA_22201_03011282126047_0014018106_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_05.pdf] Text
RAMA_22201_03011282126047_0014018106_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (329kB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_06_ref.pdf] Text
RAMA_22201_03011282126047_0014018106_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (939kB) | Request a copy
[thumbnail of RAMA_22201_03011282126047_0014018106_07_lamp.pdf] Text
RAMA_22201_03011282126047_0014018106_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy

Abstract

Delays in construction projects can lead to increased costs, reduced work quality, and potential safety risks. The Tiga Dihaji Dam project in OKU Selatan Regency, particularly in Package II, has experienced significant delays in concrete work. This study aims to analyze the dominant factors contributing to these delays and propose solutions to address the issue. The research method includes distributing questionnaires using the Likert scale to 40 respondents, consisting of contractors and consultants, along with the application of the probability sampling technique to ensure respondent selection. Additionally, field observations were conducted to obtain supplementary data that support the research analysis. The findings identify five dominant factors causing delays in concrete work: late material delivery, land acquisition issues, variations in soil conditions, the impact of the rainy season, and material shortages in the market. To mitigate these issues, several solutions can be implemented, including improving transportation infrastructure and supplier communication, extending contracts and adopting a social approach to land acquisition, developing effective soil condition management strategies, optimizing work schedules during the dry season, and enhancing material procurement planning. This research is expected to contribute to construction project management, particularly in planning, resource management, and risk mitigation strategies for delays in concrete work on dam projects.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Keterlambatan proyek, pekerjaan beton, Bendungan Tiga Dihaji.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Puspita Rahma Wijayanti
Date Deposited: 14 Mar 2025 05:08
Last Modified: 14 Mar 2025 05:08
URI: http://repository.unsri.ac.id/id/eprint/168766

Actions (login required)

View Item View Item