ANALISIS BREAK EVEN POINT PRODUKSI PADA PROYEK PENGUPASAN TANAH PENUTUP PIT MIDDLE PT PDL MENGGUNAKAN ALAT ANGKUT MERK ZOOMLION

LIDIANI, RESHA MALIDA and Ibrahim, Eddy and Asngari, Imam (2025) ANALISIS BREAK EVEN POINT PRODUKSI PADA PROYEK PENGUPASAN TANAH PENUTUP PIT MIDDLE PT PDL MENGGUNAKAN ALAT ANGKUT MERK ZOOMLION. Masters thesis, Sriwijaya University.

[thumbnail of RAMA_31101_03042682125001_Cover.jpeg]
Preview
Image
RAMA_31101_03042682125001_Cover.jpeg - Cover Image
Available under License Creative Commons Public Domain Dedication.

Download (60kB) | Preview
[thumbnail of RAMA_31101_03042682125001.pdf] Text
RAMA_31101_03042682125001.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_TURNITIN.pdf] Text
RAMA_31101_03042682125001_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_01_front_ref.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (931kB)
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_02.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_03.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (445kB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_04.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (403kB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_05.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (44kB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_06_ref.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (99kB) | Request a copy
[thumbnail of RAMA_31101_03042682125001_0022116203_0007067304_07_lamp.pdf] Text
RAMA_31101_03042682125001_0022116203_0007067304_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (387kB) | Request a copy

Abstract

PT PDL is trusted to carry out overburden removal mining activities in Pit Middle using Zoomlion unit. An economic planning analysis is needed to assess whether this project is feasible or not. The purposes of this study are to calculate the costs incurred, estimate the amount of overburden production at break even condition and identify the feasibility of the project based on economic analysis, and also determine more profitable brand between Zoomlion ZT105 or Sany SKT 90S. The research method using explanatory and comparative research to explain the relationship between costs to revenue and compare the differences between Zoomlion hauler and Sany hauler. From the result of the discussion, it was calculated that the total cost incurred from the PT PDL Pit Middle overburden removal project is Rp 521.215.875.276,-. The production break even point value of this project is 9.812.875 BCM. The result of investment feasibility analysis showed the NPV value is Rp 127.949.146.832,-, the IRR value is 102,68%, and payback period is 1,75 years, which means this project is feasible to implement. The result of the sensitivity analysis using Sany SKT 90S hauler brand also obtained a positive value, with NPV value is Rp 202.926.360.473,-, IRR is 194,64%, and payback period of 1,08 years. Based on the results of the sensitivity analysis, the use of Sany SKT 90S hauler has the potential to provide greater profits compared to the Zoomlion ZT105 hauler, this is because although Zoomlion’s hauler has larger capacity, but its operational cost is higher than Sany. Keywords : Production break even point, Zoomlion, investment feasibility analysis

Item Type: Thesis (Masters)
Uncontrolled Keywords: Break even point produksi, Zoomlion, analisis kelayakan investasi
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA177.4-185 Engineering economy
Divisions: 03-Faculty of Engineering > 31101-Mining Engineering (S2)
Depositing User: Resha Malida Lidiani
Date Deposited: 19 Jun 2025 07:29
Last Modified: 19 Jun 2025 07:29
URI: http://repository.unsri.ac.id/id/eprint/175769

Actions (login required)

View Item View Item