ANALISIS RISIKO K3 PADA TAHAPAN PENGUJIAN PRA-ENERGIZE MENGGUNAKAN METODE HIRARC DI GARDU INDUK TEGANGAN EKSTRA TINGGI 500kV NEW AUR DURI JAMBI

FADHILAH, MUHAMMAD RIDHO and Camelia, Anita (2025) ANALISIS RISIKO K3 PADA TAHAPAN PENGUJIAN PRA-ENERGIZE MENGGUNAKAN METODE HIRARC DI GARDU INDUK TEGANGAN EKSTRA TINGGI 500kV NEW AUR DURI JAMBI. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_13201_10011382025132_cover.jpg] Text
RAMA_13201_10011382025132_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (324kB)
[thumbnail of RAMA_13201_10011382025132.pdf] Text
RAMA_13201_10011382025132.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_TURNITIN.pdf] Text
RAMA_13201_10011382025132_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_01_front_ref.pdf] Text
RAMA_13201_10011382025132_0018018007_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_13201_10011382025132_0018018007_02.pdf] Text
RAMA_13201_10011382025132_0018018007_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (357kB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_03.pdf] Text
RAMA_13201_10011382025132_0018018007_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (233kB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_04.pdf] Text
RAMA_13201_10011382025132_0018018007_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_05.pdf] Text
RAMA_13201_10011382025132_0018018007_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (208kB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_06.pdf] Text
RAMA_13201_10011382025132_0018018007_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (187kB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_07_ref.pdf] Text
RAMA_13201_10011382025132_0018018007_07_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (135kB) | Request a copy
[thumbnail of RAMA_13201_10011382025132_0018018007_08_lamp.pdf] Text
RAMA_13201_10011382025132_0018018007_08_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

All work environments with high potential hazards require prevention and control efforts to avoid workplace accidents. PT Indokomas Buana Perkasa is the main contractor of the 500 kV New Aur Duri Jambi Extra High Voltage Substation project. This study aims to analyze occupational safety and health risks using the HIRARC (Hazard Identification, Risk Assessment, and Risk Control) method at the pre-energize testing stage at the GITET 500 kV New Aur Duri Jambi. A qualitative research method was used, with data collected through in-depth interviews, field observations, and document reviews. There were 8 informants in the study. Risk analysis followed the AS/NZS 4360:2004 standard, with control measures based on the SNI ISO 45001:2018 standard. The study identified seven stages of activity during the pre-energize testing stage, each with varying risk levels. Very high risks were found in visible property inspection, installation or construction circuit inspection, individual tests, and electrical installation testing. High risks were identified in measuring grounding resistance, high voltage testing, and safety and control system testing. The findings indicate that GITET 500 kV NAD Jambi has implemented risk management practices at the pre-energize testing stage. However, improvements are still needed. These include strengthening safety culture education for all guests and employees, fulfilling supporting facilities, enhancing supervision, increasing training, and ensuring the complete use of personal protective equipment (PPE).

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analisis Risiko, HIRARC, Gardu Induk
Subjects: K Law > K Law (General) > K3566-3578 Public health
R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine
R Medicine > RA Public aspects of medicine > RA565-600 Environmental health. Including sewage disposal, air pollution, nuisances,
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3001-3521 Distribution or transmission of electric power
Divisions: 10-Faculty of Public Health > 13201-Public Health (S1)
Depositing User: Muhammad Ridho Fadhilah
Date Deposited: 21 Jul 2025 02:00
Last Modified: 21 Jul 2025 02:00
URI: http://repository.unsri.ac.id/id/eprint/179436

Actions (login required)

View Item View Item