ANALISIS PENGARUH GEOMETRI PELEDAKAN DAN DELAY TIME TERHADAP FRAGMENTASI DI LOKASI PNBP TAMBANG LIMESTONE QUARRY PT SEMEN PADANG (PERSERO), SUMATERA BARAT

ASRAFI, ASRAFI and Bochori, Bochori and Hadi, Alek Al (2025) ANALISIS PENGARUH GEOMETRI PELEDAKAN DAN DELAY TIME TERHADAP FRAGMENTASI DI LOKASI PNBP TAMBANG LIMESTONE QUARRY PT SEMEN PADANG (PERSERO), SUMATERA BARAT. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282126060_cover.jpg] Image
RAMA_31201_03021282126060_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021282126060.pdf] Text
RAMA_31201_03021282126060.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (23MB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_TURNITIN.pdf] Text
RAMA_31201_03021282126060_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (34MB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (5MB)
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_02.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_03.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (634kB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_04.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_05.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (189kB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_06_ref.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (181kB) | Request a copy
[thumbnail of RAMA_31201_03021282126060_0025107401_0001069008_07_lamp.pdf] Text
RAMA_31201_03021282126060_0025107401_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

PT Semen Padang (Persero), one of Indonesia's oldest cement producers, employs drilling and blasting for rock breakage. The company's fragmentation standard is 80% for fragments measuring up to 80 cm and 20% for those over 80 cm. Direct observation indicates a high presence of boulders and secondary blasting activities, with many blasts utilizing a single free face. An average of 71 blast holes were drilled daily from January to February. Based on data from 12 blasts, the estimated fragmentation larger than 80 cm was 2.86% using the Kuz-Ram equation, while actual fragmentation analyzed with Split Desktop 4.0 showed 5.60% of fragments exceeding 80 cm. Blasting with surface delays of 17 ms and 25 ms proved more efficient and effective than 25 ms and 67 ms delays, as it shortened the blasting time and resulted in 4.34% of fragments larger than 80 cm, compared to 14.83% with 25 ms and 67 ms delays, according to Split Desktop 4.0 analysis.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Geometri Peledakan, Delay Time, Fragmentasi.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Asrafi Asrafi
Date Deposited: 26 Jul 2025 15:43
Last Modified: 26 Jul 2025 15:43
URI: http://repository.unsri.ac.id/id/eprint/180740

Actions (login required)

View Item View Item