DARUSSALAM, MUCHAMAD RIZKY and Hasjim, Machmud and Puspita, Mega (2025) EVALUASI DESIGN LIFE OF MINE TERHADAP BATAS AREA KERJA GUNA MENGHITUNG ESTIMASI BIAYA PENAMBANGAN DI PIT 1A PT MULTI SERVICE MINING SITE PT GORBY ENERGY, KABUPATEN MUSI RAWAS UTARA, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
![]() |
Image
RAMA_31201_03021282126068_cover.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (961kB) |
![]() |
Text
RAMA_31201_03021282126068.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (3MB) |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (593kB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (439kB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (289kB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (248kB) | Request a copy |
![]() |
Text
RAMA_31201_03021282126068_8871510016_0005039303_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
Abstract
The Life of Mine (LOM) Pit 1A design of PT Multi Service Mining underwent modifications due to a boundary with PT Anugrah Cofindo Indonesia, reducing the mining area from 57.598 ha to 50.094 ha. This resulted in a decrease in overburden reserves (from 10,745,290.68 BCM to 9,489,031.26 BCM) and coal (from 3,182,393.99 Tons to 2,769,738.83 Tons). Operations using 7 fleets yield an annual capacity of 4,814,356.29 BCM of overburden and 1,431,691.11 Tons of coal. Although reserves decreased, financial analysis shows that the efficiency and profitability of the new design are better. Total costs decreased from Rp370,555,893,962 (old) to Rp316,138,076,739 (new). Most significantly, Net Profit increased from Rp20,558,040,123 (old) to Rp28,221,944,111 (new), showing an increase in profitability of Rp7,663,903,988.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Life of Mine (LOM), Desain, Batas Area, Biaya. |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Muchamad Rizky Darussalam |
Date Deposited: | 26 Jul 2025 16:14 |
Last Modified: | 26 Jul 2025 16:14 |
URI: | http://repository.unsri.ac.id/id/eprint/180866 |
Actions (login required)
![]() |
View Item |