KAJIAN KESESUAIAN PERHITUNGAN VOLUME OVERBURDEN ANTARA JOINT SURVEY DAN TRUCK COUNT MONITORING SYSTEM DI PT MULTI SERVICE MINING SITE PT GORBY ENERGY, KABUPATEN MUSI RAWAS UTARA, PROVINSI SUMATERA SELATAN

CHERRY, CHELSEA GABY MAURA and Syarifudin, Syarifudin and Cahyaningsih, Bimbi (2025) KAJIAN KESESUAIAN PERHITUNGAN VOLUME OVERBURDEN ANTARA JOINT SURVEY DAN TRUCK COUNT MONITORING SYSTEM DI PT MULTI SERVICE MINING SITE PT GORBY ENERGY, KABUPATEN MUSI RAWAS UTARA, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282126048_cover.jpg]
Preview
Image
RAMA_31201_03021282126048_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (418kB) | Preview
[thumbnail of RAMA_31201_03021282126048.pdf] Text
RAMA_31201_03021282126048.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (25MB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_TURNITIN.pdf] Text
RAMA_31201_03021282126048_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_01_front_ref.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB)
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_02.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (450kB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_03.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (388kB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_04.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (436kB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_05.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (263kB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_06_ref.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (229kB) | Request a copy
[thumbnail of RAMA_31201_03021282126048_ 0004097401_ 0205069201_07_lamp.pdf] Text
RAMA_31201_03021282126048_ 0004097401_ 0205069201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (973kB) | Request a copy

Abstract

PT Multi Service Mining is one of PT Gorby Energy's contractors in the coal mining sector located in North Musi Rawas Regency, South Sumatra Province, which uses the strip mining method in coal mining activities. In calculating the volume of overburden, two methods are used, namely joint survey and truck count. Joint survey is a data collection method in the mining industry used in creating topographic maps of mining areas both before and after mining activities are completed. In addition to using the joint survey method, the results of the truck count can be used to calculate the volume. Truck count is a volume calculation based on the results of multiplying the number of trips by the capacity of the transport vessel recorded by the production recorder (checker) through a timesheet that will later be processed by the engineering team. The purpose of this study is to technically review the measurement data from the survey with the data from the truck count results, determine the factors that cause discrepancies in the volume of overburden between the survey data and the results of the truck count and provide efforts to minimize the difference in overburden volume between the results of the survey and the truck count. From the results of observations and research conducted, the overburden volume in March 2025 based on a joint survey was 183,956.521 BCM and the truck count was 174,635 BCM. The overburden volume ratio was 4.52%. This was caused by several factors, namely non-compliance with truck factor standards, the presence of untransported material, loading the load on the transport vehicle, human errors, and environmental conditions.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Overburden, Survey, Truck Count
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Chelsea Geby Maura Cherry
Date Deposited: 05 Aug 2025 02:48
Last Modified: 05 Aug 2025 02:48
URI: http://repository.unsri.ac.id/id/eprint/182136

Actions (login required)

View Item View Item