PERBANDINGAN KOEFISIEN ANALISA HARGA SATUAN UNTUK PEKERJAAN JALAN DENGAN METODE ANALISA SNI DAN LAPANGAN

ALIM, KEMAS RAMADHAN SYUKRON and Juliantina, Ika and Adhitya, Bimo Brata (2019) PERBANDINGAN KOEFISIEN ANALISA HARGA SATUAN UNTUK PEKERJAAN JALAN DENGAN METODE ANALISA SNI DAN LAPANGAN. Undergraduate thesis, Sriwijaya Univerisity.

[thumbnail of RAMA_22201_03011281520101.pdf] Text
RAMA_22201_03011281520101.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (19MB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_TURNITIN.pdf] Text
RAMA_22201_03011281520101_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (36MB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_01_front_ref.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB)
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_02.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (593kB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_03.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (350kB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_04.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (571kB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_05.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (287kB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_06_ref.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (182kB) | Request a copy
[thumbnail of RAMA_22201_03011281520101_0001076005_0010038104_07_lamp.pdf] Text
RAMA_22201_03011281520101_0001076005_0010038104_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy

Abstract

On the road from Palembang to Indralaya, traffic jams often occur. So that the Palembang-Indralaya toll road was built which is one of the solutions from the government. In planning the cost of the Palembang-Indralaya toll road project, it requires a unit price analysis. The unit price analysis used in planning is the unit price analysis of the Indonesian National Standard (SNI). In the Indonesian National Standard, unit prices are influenced by the coefficient of material, wages and heavy equipment. SNI's coefficient in planning has a difference with the actual coefficient. The purpose of this study is to find out the differences between SNI and actual coefficients. The research on the Palembang-Indralaya toll road project was carried out by direct observation of the Palembang-Indralaya toll road project to obtain actual data as primary data. Analysis of SNI's unit prices is used as secondary data analysis of SNI's unit price data and each field data are analyzed to obtain SNI's coefficients and actual coefficients. From the results of the analysis, the average field coefficient is around 30% smaller than the SNI's coefficient. The biggest difference is in the coefficient of the dump truck. Differences in SNI coefficients and the actual coefficients are caused by differences in implementation methods in the project because they are adjusted to the conditions and needs in the project, differences equipments between SNI and the project, differences in productivity of heavy equipment and the number of workers in the project. So the unit price of the field work is about 30% smaller than the analysis of the unit price of SNI

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: SNI, Toll Road, Coefficient, Unit Price, Actual
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Users 556 not found.
Date Deposited: 02 Aug 2019 06:13
Last Modified: 02 Aug 2019 06:13
URI: http://repository.unsri.ac.id/id/eprint/1893

Actions (login required)

View Item View Item