EVALUASI PENGATURAN PERALATAN PENAMBANGAN BATUBARA DALAM MENCAPAI TARGET PRODUKSI DI SITE MUARA TIGA BESAR PT BUKIT ASAM. TBK, TANJUNG ENIM SUMATERA SELATAN

SAPUTRA, GADING AKBAR and Rahman, A and Bochori, Bochori (2019) EVALUASI PENGATURAN PERALATAN PENAMBANGAN BATUBARA DALAM MENCAPAI TARGET PRODUKSI DI SITE MUARA TIGA BESAR PT BUKIT ASAM. TBK, TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181520139.pdf] Text
RAMA_31201_03021181520139.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_TURNITIN.pdf] Text
RAMA_31201_03021181520139_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181520139_00227035604_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_02.pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (615kB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_03.pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (349kB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_04 .pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_04 .pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (291kB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_05.pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (92kB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_06_ref.pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (107kB) | Request a copy
[thumbnail of RAMA_31201_03021181520139_00227035604_0025107401_07_lamp.pdf] Text
RAMA_31201_03021181520139_00227035604_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (920kB) | Request a copy

Abstract

The mining of coal at the Muara Tiga Besar Utara Site (MTBU), PT Bukit Asam cooperates with the contractor PT Pama Persada Nusantara in mining process. The contractor PT Pama Persada Nusantara conducted coal mining activities to meet April production target of 450000 tons using 5 fleet of equipment. 3 fleets on the East MTBU front where fleets 1 and 2 consist of 1 loadingband unloading tools and 5 conveyances while fleet 3 consists of 1 loadingband unloading tools and 4 conveyances. 2 fleet of tools on the West MTBU front where fleets 1 and 2 consist of 1 loadingband unloading tools and 5 conveyances. The research objective is to determine the settings of the tools used to achieve production targets, find out the amount of production can be achieved or not, then analyze and improve so that production targets are achieved. The research method was carried out by taking data in the form of cycle time of loading and unloading equipment and then transporting them to calculate productivity of the equipment in order to know the amount of production. The results of the calculation of coal production from arrangement ofbthe equipment in field by the five fleets theoretically based on calculation from productivitybof digging tool reaches 630,021 tons while the calculation of real production based on productivity conveyor theoretically only reaches 431,718 tons of coal. It needs to analyzed and improved so that production targets can be succes

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: MTBU, Pengaturan alat, Target produksi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN799.5-948 Nonmetallic minerals > TN817.S6 Bituminous coal.
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 3732 not found.
Date Deposited: 17 Dec 2019 05:25
Last Modified: 17 Dec 2019 05:25
URI: http://repository.unsri.ac.id/id/eprint/21873

Actions (login required)

View Item View Item