Peer Review dan Similarity - An Analysis of The Damage and Estimated Maintenance Costs A. Rozak Street City of Palembang

Bayumi, Oktarine and Putranto, Dinar DA and Ika, Juliantina (2018) Peer Review dan Similarity - An Analysis of The Damage and Estimated Maintenance Costs A. Rozak Street City of Palembang. In: SENTEN 2018- Symposium of Emerging Nuclear Technology and Engineering Novelty, 4-5 July, Aryaduta, Palembang.

[thumbnail of SENTEN.] Other (SENTEN.)
pdf (5)

Download (654kB)
[thumbnail of Berkas Bayumi.]
Preview
Text (Berkas Bayumi.)
Berkas_Bayumi_New.pdf

Download (4MB) | Preview
[thumbnail of Plagiarsm Bayumi.]
Preview
Text (Plagiarsm Bayumi.)
Oktorine_2019_J._Phys.__Conf._Ser._1198_082019(2).pdf

Download (2MB) | Preview
[thumbnail of Prof. Bangun peer Reviewr Bayumi.]
Preview
Text (Prof. Bangun peer Reviewr Bayumi.)
Peer_Review_SENTEN-Bayumi.pdf

Download (892kB) | Preview
[thumbnail of Prof. Vincent peer Reviewr Bayumi.]
Preview
Text (Prof. Vincent peer Reviewr Bayumi.)
Vincent_Peer_Review-SENTEN_-Bayumi.pdf

Download (964kB) | Preview
[thumbnail of Peer Review SENTEN Bayumi]
Preview
Text (Peer Review SENTEN Bayumi)
Peer_Reviewr-SENTEN-Bayumi.pdf

Download (2MB) | Preview
[thumbnail of Turnitin SENTEN Bayumi.]
Preview
Text (Turnitin SENTEN Bayumi.)
Turnitin_SENTEN_Bayumi.pdf

Download (2MB) | Preview

Abstract

A. Rozak Street is one of the city's streets that functions as a liaison between Patal Pusri Street with Monghinsidi.i Street. This road played an important role as a liaison to the industry area access and warehousing which have long 4.181 km, having two lanes to four lanes and a width of 14 m with the kind of roughness supple. The purpose of this research is to get how big the damage condition and value levels of damage with the clan Method so it can be known how much cost to repair on segment of A. Rozak Street City of Palembang. The kind of damage that occur, there are 7 different with each wave Damage Values 5,576.50 m2, the Groove 258.56 m2, Vanish 834.95 m2, convex 329.3 m2, The Damage To The Banks 452,91 m2, Cracked Lines 570.70 m2, Overweight 842,5 m2. Damage to the most dominant type of wave damage 9,53%, overweight 1,44%. The level of damage to the road conditions are with priority handling maintenance intervals. Based on the results of the estimation of costs to A. Rozak Street City of Palembang is Rp. 1,981,096,815.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA1-2040 Engineering (General). Civil engineering (General) > TA144 General works. Civil engineering, etc. Early to 1850

#3 Repository of Lecturer Academic Credit Systems (TPAK) > Results of Ithenticate Plagiarism and Similarity Checker
Depositing User: Dr. Ir. Dinar Dwi Anugerah Putranto
Date Deposited: 06 Jan 2020 06:11
Last Modified: 06 Jan 2020 06:11
URI: http://repository.unsri.ac.id/id/eprint/23027

Actions (login required)

View Item View Item