RIZKI, MUHAMMAD and Wahab, Herlina (2019) EVALUASI DAN KOORDINASI SETTING RELAI OCR DAN GFR PADA GARDU INDUK NEW JAKABARING. Undergraduate thesis, Sriwijayan University.
Text
RAMA_20201_03041381720038.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (401kB) |
|
Text
RAMA_20201_03041381720038_0007078005_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (436kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (224kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (449kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (77kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_0007078005_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (493kB) | Request a copy |
|
Text
RAMA_20201_03041381720038_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (9MB) | Request a copy |
Abstract
In the electricity system interconnection in Indonesia, usually usig an open type of conductor in the open space which contains a lot of risk of short circuit interference. The magnitude of the short circuit noise that may occur in an electrical system can damage and disrupt the electricity distribution system equipment. For this reason, an electric power system requires the coordination of a protection system to separate equipment that has been distrupted. From the calculation results obtained at the New Jakabaring Substation of four feeders namely Padjajaran, Kutai, Mataram, Sriwijaya feeders for Overcurrent Relay (OCR) settings on a 150 kV primary side transformer having a TMS of 0,307 SI, a 20 kV secondary side transformer has TMS 0,18 SI, the recipient of Padjajaran has a TMS is 0,07 SI, in the Kutai feeder has TMS 0,11 SI, the Mataram feeder has a TMS of 0,06 SI, and the Sriwijaya feeder has TMS of 0,14 SI. For setting Ground Fault Relay (GFR) on a 150 kV primary side transformer having a TMS of 0,404 SI, a 20 kV secondary side transformer has a TMS of 0,235 SI, Padjajaran feeder, Kutai, Mataram, and Sriwijaya having a TMS of 0,10098
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | setting relai, OCR, GFR |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1-9971 Electrical engineering. Electronics. Nuclear engineering |
Divisions: | 03-Faculty of Engineering > 20201-Electrical Engineering (S1) |
Depositing User: | Users 885 not found. |
Date Deposited: | 12 Aug 2019 04:24 |
Last Modified: | 13 Aug 2019 02:49 |
URI: | http://repository.unsri.ac.id/id/eprint/2342 |
Actions (login required)
View Item |