STUDI BIAYA PENGUPASAN OVERBURDEN PER BCM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

RAMADHAN, MUHAMMAD ILHAM and Rahman, A and Bochori, Bochori (2020) STUDI BIAYA PENGUPASAN OVERBURDEN PER BCM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381520097.pdf] Text
RAMA_31201_03021381520097.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_TURNITIN.pdf] Text
RAMA_31201_03021381520097_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381520097_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381520097_0025107401_02.pdf] Text
RAMA_31201_03021381520097_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (442kB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_03.pdf] Text
RAMA_31201_03021381520097_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (566kB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_04.pdf] Text
RAMA_31201_03021381520097_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (355kB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_05.pdf] Text
RAMA_31201_03021381520097_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10kB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_06_ref.pdf] Text
RAMA_31201_03021381520097_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (211kB) | Request a copy
[thumbnail of RAMA_31201_03021381520097_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381520097_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT Bukit Asam Tbk Tanjung Enim Mining Unit (UPTE) is a State-Owned Enterprise (SOE) company engaged in the field of energy and coal mining with 3 main mining areas namely Air Laya Mine (TAL), Muara Tiga Besar (MTB), and West Banko. The mining system in Pit 2 West Banko uses an open pit mining system by applying conventional methods, which are a combination of the work of the digging loading equipment and hauling equipment as a primary mining tool. Overburden stripping activities at Pit 2 West Banko using an electric-powered digging and loading tool Komatsu Shovel Excavator PC 3000 E6 and Belaz 75135 Rigid Truck. The existence of a digging and loading equipment and a hauling equipment plays an important role to support the success of the mining activity itself. Therefore the two main mining tools must be used as optimal as possible. Overburden stripping activities at Pit 2 West Banko are managed by the Electrification Mining Work Unit. An electrically powered digging and loading tool is a new equipment used by PT Bukit Asam Tbk in Pit 2 and Pit East 3 West Banko which is targeted to produce large overburden production at a low cost. This study aims to determine how much real production and to find out how much stripping costs incurred by the Electrification Mining Work Unit to strip by BCM overburden. Then to prove whether it is true that by using an electrically powered digging and loading tool stripping costs will be cheaper than using a diesel-powered digging and loading tool. The method used in this research is by comparing the cost of overburden stripping by BCM between electrically powered digging and loading tool and diesel powered digging and loading tool so that it will be known whether by using an electric powered digging and loading tool the costs incurred will be cheaper. Real overburden production in February 2019 at Pit 2 West Banko amounted to 1,075,980 BCM. Overburden stripping costs by BCM incurred by the Electrification Mining Work Unit are Rp.12,963.56 / BCM with a total equipment cost incurred of Rp.13,948,535,700.24. Equipment costs incurred consist of owning costs and operating costs. Owning costs incurred include the cost of depreciation and interest, insurance, taxes. While operating costs incurred include fuel costs, the cost of full maintenance contract equipment, and operator salaries. Then there are also general costs incurred that is the cost of drilling and blasting, and the cost of renting mining support equipment. Based on the results of the study it can be concluded that the cost of overburden stripping by BCM incurred by the Electrification Mining Work Unit using an electrically powered digging and loading tool turns out to be cheaper than the cost of overburden stripping using a diesel powered digging and loading tool

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Penambangan elektrifikasi, biaya pengupasan, produksi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 5549 not found.
Date Deposited: 23 Mar 2020 06:06
Last Modified: 23 Mar 2020 06:06
URI: http://repository.unsri.ac.id/id/eprint/28488

Actions (login required)

View Item View Item