RENCANA WAKTU PEMELIHARAAN KOLAM PENGENDAPAN LUMPUR DI PIT 1 TIMUR BANGKO BARAT PT BUKIT ASAM TANJUNG ENIM SUMATERA SELATAN

SADIKIN, MUHAJIR and Handayani, Rr. Harminuke Eko and Mukiat, Mukiat (2019) RENCANA WAKTU PEMELIHARAAN KOLAM PENGENDAPAN LUMPUR DI PIT 1 TIMUR BANGKO BARAT PT BUKIT ASAM TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181520138.pdf] Text
RAMA_31201_03021181520138.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_TURNITIN.pdf] Text
RAMA_31201_03021181520138_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181520138_0009026905_0022115801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_02.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (496kB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_03.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (369kB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_04.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (736kB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_05.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7kB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_06_ref.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (183kB) | Request a copy
[thumbnail of RAMA_31201_03021181520138_0009026905_0022115801_07_lamp.pdf] Text
RAMA_31201_03021181520138_0009026905_0022115801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (903kB) | Request a copy
[thumbnail of ABSTRAK MUHAJIR SADIKIN.docx] Text
ABSTRAK MUHAJIR SADIKIN.docx - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13kB) | Request a copy

Abstract

Settling pond is one of the mining support facilities that used as a place to store and treat acid mine drainage to meet environmental quality standards before flowing into the river. Over time mining operation progresses KPL will experience silting due to the presence of TSS that settles in each compartment. Efforts to overcome this problem are made by planning the maintenance time of compartment. In planning maintenance time of compartmen using method of analytical and laboratory tests then carried out of data processing to obtain compartment maintenance time that proper. In laboratory tests a solid particle size test is carried out to calculate the settling speed so that solid particle settling time is obtainend. Next calculate the speed and time of water to get out of the compartment so that obtain the settling percentage. Then the solid percent tests is used to calculate how many solid particles are deposited from the flowing discharge. From these results get the volume of sludge per day is deposited and the amount of sedimentation until filling the pond. The productivity of the digging tools is useful for obtaining dredging time so that compartment maintenance time from compartments 1 to 7 is obtained 2 months, 3 months, 5 months, 15 months, 10 months, 6 months and 10 months. Keywords : Settling Pond, Total Suspended Solid (TSS), Compartment Maintenance Time

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kolam pengendapan lumpur, Total padatan tersuspensi (TSS), Waktu pemeliharaan kompartemen
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD429.5-480.7 Water purification. Water treatment and conditioning. Saline water conversion
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 1168 not found.
Date Deposited: 08 Aug 2019 07:35
Last Modified: 08 Aug 2019 07:35
URI: http://repository.unsri.ac.id/id/eprint/2983

Actions (login required)

View Item View Item