Economic aspects of interlocking hollow brick system designed for industrialized building system

Tahir, Mahmood Md. and Saggaff, Anis and Ngian, Shek Poi and Sulaiman, Arizu (2017) Economic aspects of interlocking hollow brick system designed for industrialized building system. AIP Conference Proceedings, 1903. 070018-1. ISSN AIP Conference Proceedings 1903, 070018 (2017)

[thumbnail of 1. Economic aspects of interlocking hollow (2017).pdf]
Preview
Text
1. Economic aspects of interlocking hollow (2017).pdf

Download (601kB) | Preview

Abstract

Construction industry has moved forward into a technology driven where a transition is in progress from conventional method to a more advanced and mechanised system known as the Industrialised Building System (IBS). However, the need to implement the IBS should be well understood by all construction players such as designer, architect, contraction, erectors and construction workers. Therefore, there is a need to educate all these construction players which should be spearheaded by authorities such as Construction Industrial Development Board where enforcement trough building by laws as well as initiative to those that adopt the IBS in their construction. This paper reports on economic aspects of using interlocking hollow brick system in construction as an alternative method offered for Industrialized Building System. The main objective is to address the economic aspects of using interlocking block system in terms of time, costs, and utilization of manpower and to present some of the experimental tests results related to Interlocking Hollow Brick System (IHBS). Example of savings from the use of IHBS is presented in this paper by comparing the construction of two storey terrace house with build-up area of about 200 square meter with conventional construction method of typical reinforced concrete construction (RCC) compared to IHBS. The comparison shows that the implementation of IHBS can reduce construction time, cost, and utilization of man power up to 26.6% compared to the conventional method. Moreover, the construction time using IHBS can also be reduced by up to 50% as compared to the conventional construction.

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA1-2040 Engineering (General). Civil engineering (General) > TA169.H37 Reliability (Engineering), Engineering design, Civil engineering
Divisions: 03-Faculty of Engineering > 22101-Civil Engineering (S2)
Depositing User: Prof Anis Saggaff
Date Deposited: 07 Aug 2020 07:34
Last Modified: 07 Aug 2020 07:34
URI: http://repository.unsri.ac.id/id/eprint/32500

Actions (login required)

View Item View Item