STUDI FAKTOR KEPADATAN HAULING ROAD TRAFFIC TERHADAP PRODUKSI BATUBARA DI PIT 1 UTARA BANKO BARAT PT BUKIT ASAM Tbk. TANJUNG ENIM SUMATERA SELATAN

PRATAMA, ERLANGGA and Toha, M. Taufik and Bochori, Bochori (2020) STUDI FAKTOR KEPADATAN HAULING ROAD TRAFFIC TERHADAP PRODUKSI BATUBARA DI PIT 1 UTARA BANKO BARAT PT BUKIT ASAM Tbk. TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381520074.pdf] Text
RAMA_31201_03021381520074.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_TURNITIN.pdf] Text
RAMA_31201_03021381520074_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381520074_8864000016_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Preview
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_02.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (486kB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_03.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (658kB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_04.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (802kB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_05.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (187kB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_06_ref.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (386kB) | Request a copy
[thumbnail of RAMA_31201_03021381520074_8864000016_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381520074_8864000016_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT.Bukit Asam, Tbk Unit Penambangan Tanjung Enim merupakan perusahaan holding BUMN yang bergerak dalam bidang energi dan pertambangan batubara dan memiliki tiga lokasi penambangan, yakni Tambang Air Laya (TAL), Muara Tiga Besar (MTB), dan Banko Barat. Sistem penambangan pada wilayah Penambangan Banko Barat menggunakan sistem tambang terbuka dengan metode shovel and truck. Penambangan batubara Pit 1 utara Banko Barat memiliki rencana produksi alat untuk bulan Agustus 2019 yaitu sebesar 563.000 ton. Ketercapaian produksi alat tentunya tidak terlepas dari faktor-faktor yang dapat mempengaruhi produksi alat yang beroperasi, baik itu alat gali muat maupun alat angkut, Berdasarkan hasil perhitungan produksi alat angkut yang belum mencapai target produksi yang direncanakan yaitu sebesar 446.675 ton. Faktor-faktor yang mempengaruhi produksi alat gali muat dan alat angkut pada penambangan batubara di Pit 1 utra Banko Barat antara lain kekuatan material, faktor pengisian bucket (bucket fill factor), kondisi front penambangan dan dump hopper, geometri jalan, kepadatan lalulintas jalan angkut (Hauling Road Rraffic), match factor, dan efisiensi kerja, namun pada penelitian ini hanya difokuskan pada variable penyebab dan cara mengatasi hauling road traffic.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Cycle Time, Produksi, Hauling Road Traffic
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 7388 not found.
Date Deposited: 23 Aug 2020 07:56
Last Modified: 23 Aug 2020 07:56
URI: http://repository.unsri.ac.id/id/eprint/33077

Actions (login required)

View Item View Item