PRA RANCANGAN PABRIK PEMBUATAN 1,2-PROPANEDIOL KAPASITAS 40.000 TON/TAHUN

CHANDRA, INDAH MEDIAN and NOPRIYANSYAH, MUHAMMAD and Agustina, Tuty Emilia (2020) PRA RANCANGAN PABRIK PEMBUATAN 1,2-PROPANEDIOL KAPASITAS 40.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_24201_03031181621027_03031281621035.pdf] Text
RAMA_24201_03031181621027_03031281621035.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_TURNITIN.pdf] Text
RAMA_24201_03031181621027_03031281621035_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (17MB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_01_front_ref.pdf]
Preview
Text
RAMA_24201_03031181621027_03031281621035_0009087208_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_02.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (255kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_03.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (324kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_04.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (141kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_05.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (754kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_06.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (583kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_07.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_07.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (547kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_08.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_08.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (398kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_09.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_09.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_06_ref.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (306kB) | Request a copy
[thumbnail of RAMA_24201_03031181621027_03031281621035_0009087208_07_lamp.pdf] Text
RAMA_24201_03031181621027_03031281621035_0009087208_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy

Abstract

Pabrik pembuatan 1,2-Propanediol dengan kapasitas 40.000 ton/tahun ini direncanakan berdiri pada tahun 2025 di Jalan Pantai Tj. Peni, Kecamatan Citangkil, Cilegon, Banten yang diperkirakan memiliki luas area 4,5 Ha. Proses pembuatan 1,2-propanediol ini mengacu pada U.S. Patent 2019/0256447 A1, dimana proses yang digunakan merupakan proses hidrogenolisis gliserol pada reaktor Trickle Bed menggunakan katalis CuZnOAl2O3 pada temperatur 205oC dan tekanan 20 atm. Reaksi yang terjadi pada reaktor adalah sebagai berikut: C3H8O3 (l) + H2 (g) = C3H8O2 (l) + H2O (l) (Gliserol) (Hidrogen)(1,2-Propanediol) (Air) Pabrik yang akan didirikan ini merupakan perusahaan berbentuk Perseroan Terbatas (PT) dengan sistem organisasi Line and Staff, dengan total karyawan 132 orang. Berdasarkan hasil analisa ekonomi, pabrik 1,2-propanediol ini layak didirikan karena telah memenuhi persyaratan parameter ekonomi, yaitu: • Total Capital Investment = US $ 32.055.405,70 • Selling price = US $ 140.471.037,40 • Total Production Cost = US $ 113.873.772,11 • Annual Cash Flow = US $ 20.951.719,24 • Pay Out Time = 1,4025 tahun • Rate of Return on Investment = 58,0810 % • Discounted Cash Flow = 81,5858 % • Break Event Point (BEP) = 33,9028 % • Service Life = 11 tahun Kata Kunci : 1,2-Propanediol, Trickle Bed Reactor, Analisa Ekonomi

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: 1,2-Propanediol, Trickle Bed Reactor, Analisa Ekonomi
Subjects: T Technology > TP Chemical technology > TP155-156 Chemical engineering > TP155.5P4 Chemical plants--Design and construction
Divisions: 03-Faculty of Engineering > 24201-Chemical Engineering (S1)
Depositing User: Users 7396 not found.
Date Deposited: 25 Aug 2020 05:29
Last Modified: 25 Aug 2020 05:29
URI: http://repository.unsri.ac.id/id/eprint/33179

Actions (login required)

View Item View Item