ELVANDARI, SERLI and Susanti, Betty and Juliantina, Ika (2021) ANALISIS PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_22201_03011181722015.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
|
Text
RAMA_22201_03011181722015_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
|
Preview |
Text
RAMA_22201_03011181722015_0004018001_0001076005_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (6MB) | Preview |
Text
RAMA_22201_03011181722015_0004018001_0001076005_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (506kB) | Request a copy |
|
Text
RAMA_22201_03011181722015_0004018001_0001076005_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (51kB) | Request a copy |
|
Text
RAMA_22201_03011181722015_0004018001_0001076005_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_22201_03011181722015_0004018001_0001076005_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (114kB) | Request a copy |
|
Text
RAMA_22201_03011181722015_0004018001_0001076005_06_Ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (5MB) | Request a copy |
|
Text
RAMA_22201_03011181722015_0004018001_0001076005_07_Lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
Abstract
Construction projects are complex activities so there is a discrepancy between planning and realization in the field often occurs. Project planning and control is urgently needed in order for the project to be completed according to the plan. The purpose of this analysis is to find out if the implementation is in accordance with the plan and how much time is left to complete the Mapolda Building Construction Project in South Sumatra. The scope of project control analysis is carried out on the Mapolda Building Construction Project of South Sumatra which is reviewed in week 1 to week 12, with earned value analysis method, with analysis of cost value calculation and project budget, variance parameters, performance parameters and estimated cost and project completion time. The results of the analysis showed the project experienced an increase of 15.8% from the cost of the plan and an increase of 8.67% from the project plan schedule with the calculation of estimated completion costs of Rp. 71,765,687,190 and the estimated completion time of the project for 163 weeks.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Project Control, Earned Value Analysis, Time and Cost Control |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Users 11987 not found. |
Date Deposited: | 11 May 2021 06:39 |
Last Modified: | 11 May 2021 06:39 |
URI: | http://repository.unsri.ac.id/id/eprint/46444 |
Actions (login required)
View Item |