RANCANGAN SEQUENCCE PENAMBANGAN UNTUK MEMENUHI TARGET PRODUKSI 600.000 TON BATUBARA DI PIT 2 PT LAHAT PULAU PINANG BARA JAYA, KABUPATEN LAHAT, SUMATERA SELATAN

BANJARNAHOR, BENNI and Mukiat, Mukiat and Suwardi, Fuad Rusydi (2021) RANCANGAN SEQUENCCE PENAMBANGAN UNTUK MEMENUHI TARGET PRODUKSI 600.000 TON BATUBARA DI PIT 2 PT LAHAT PULAU PINANG BARA JAYA, KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281621050.pdf] Text
RAMA_31201_03021281621050.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_TURNITIN.pdf] Text
RAMA_31201_03021281621050_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15MB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621050_NIDN1_NIDN2_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_02.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (681kB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_03.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_04.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_05.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (229kB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_06_ref.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (186kB) | Request a copy
[thumbnail of RAMA_31201_03021281621050_NIDN1_NIDN2_07_lamp.pdf] Text
RAMA_31201_03021281621050_NIDN1_NIDN2_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (477kB) | Request a copy

Abstract

PT Lahat Pulau Pinang Bara Jaya (LPPBJ) is located in Merapi Selatan District, Lahat Regency. PT LPPBJ sets an annual coal production target of 600,000 tonnes. To fulfill this production target, PT LPPBJ open a new pit in the research area, namely pit 2, so it is necessary to have a planned, safe, and economical pit design, and is able to support the achievement of the planned production target. The limit value of economic stripping ratio (BESR) allowed by the company is 4: 1. The pit design was made using Minescape 5.7 software, the slope geometry was designed using the geotechnical recommendations of PT LPPBJ. The research resulted in the design of the LOM pit 2 pit with a total coal reserve of 1,799,636 tons, 5,002,988.1 BCM of overburden and an opening area of 15.86 Ha, which is divided annually according to the planned production target. The width of the mine road in the design is 11 m with a maximum grade of 10%. The overall stripping ratio obtained from the design is 2.78 BCM / ton. Based on the production target and total reserves as well as the 10% loss assumption, the mine life in pit 2 is 2.73 years. The design of the direction of the annual mining stage is made following the direction of coal dip and strike, the working slope is designed with a minimum width of 11 m. The annual pit sequence design is made in 3 sequences where in the initial 2 sequences everything is able to support 100% of the annual coal production target, while in the year 3 sequence design which is the remainder of the previous design it is only able to support 65% of the total annual production target. The designs in the first year are divided into monthly designs with a production target of 50,000 tons of coal every month for 12 months. Disposal area is designed to the south of high wall pit 2, the disposal area will support overburden stripping in year 1 to year 3. The disposal design is designed to have a volume capacity capable of supporting 5,002,988.1 BCM according to the stripping target for the entire mine. The number of digging equipment needed each year consists of 4 units Doosan 520LCA excavators and 18 Units Hino 500 dump trucks.

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
T Technology > TN Mining engineering. Metallurgy > TN799.5-948 Nonmetallic minerals > TN817.S6 Bituminous coal.
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Benni Banjarnahor
Date Deposited: 29 Jul 2021 00:27
Last Modified: 29 Jul 2021 00:27
URI: http://repository.unsri.ac.id/id/eprint/50864

Actions (login required)

View Item View Item