EVALUASI DAN RENCANA REKONTRUKSI SERTA PRESERVASI GEOMETRI JALAN DI SITE KUNGKILAN PT BUMI MERAPI ENERGI, MERAPI SELATAN, KABUPATEN LAHAT

DALIMUNTHE, HIKMA WAHYU and Mukiat, Mukiat and Ningsih, RR. Yunita Bayu (2022) EVALUASI DAN RENCANA REKONTRUKSI SERTA PRESERVASI GEOMETRI JALAN DI SITE KUNGKILAN PT BUMI MERAPI ENERGI, MERAPI SELATAN, KABUPATEN LAHAT. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381823084.pdf] Text
RAMA_31201_03021381823084.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_TURNITIN.pdf] Text
RAMA_31201_03021381823084_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381823084_0022115801_0023037813_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_02.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (348kB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_03.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (182kB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_04.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_05.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15kB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_06_ref.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14kB) | Request a copy
[thumbnail of RAMA_31201_03021381823084_0022115801_0023037813_07_Lamp.pdf] Text
RAMA_31201_03021381823084_0022115801_0023037813_07_Lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (844kB) | Request a copy

Abstract

PT Bumi Merapi Energi (BME) is a private company engaged in mining which has three large blocks, namely Serelo, Kungkilan, and Gunung Agung blocks with reserves of 130 million tons. By having PT BME's overburden stripping planning target in 2021 it is 2,460,647.88 bcm/year, while the actual stripping is 1,283,028.00 bcm/year. This is due to road geometry that does not meet the 2018 KEPMEN 1827 K 30 standard, such as haul road width, cross slope¸superelevation¸and road grade. Based on this, the purpose of this study is to evaluate and preserve the road geometry in order to obtain maximum production results. Based on the measurements and observations, there are three factors that do not meet the standard road geometry, namely the width of the haul road, cross slope, and superelevation. The actual haul road width of PT BME on straight roads is 7.7-14.87 meters, while on bend roads it is 8-14.6 meters. The radius and superelevation of PT BME are 61.16 meters for the radius and 0.34-0.62 meters for the superelevation, and the cross slope value of PT BME is 0.01-0.13 meters. Of the three factors, there are several segments that do not meet the standard, so it needs to be evaluated to get maximum tool productivity results. The productivity of PT BME's loading and unloading equipment before the repair resulted in the productivity of the Hyundai 330 LC-9S excavator being 129.21 bcm/hour and the productivity of the Hino 500 FM 260 JD Dump truck conveying 17.33 bcm/hour, with match factor of 0.67. Meanwhile, the productivity of the Hyundai Excavator 330 LC-9S after the repair was 129.21 bcm/hour and the productivity of the Hino 500 FM 260 JD Dump truck after the repair was 26.66 bcm/hour with a match factor of 1.03.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Geometri jalan, Produktivitas Alat, Jalan Angkut, Alat gali muat dan angkut.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mr Hikma Wahyu Dalimunthe
Date Deposited: 30 Mar 2022 07:18
Last Modified: 30 Mar 2022 07:18
URI: http://repository.unsri.ac.id/id/eprint/67327

Actions (login required)

View Item View Item