ANALISIS KETERCAPAIAN PRODUKSI OVERBURDEN BULAN OKTOBER-DESEMBER 2021 DI PT ULIMA NITRA SITE PT DUTA BARA UTAMA, MUARA ENIM, SUMATERA SELATAN

MAHARANI, AULIA and Toha, M. Taufik and Purbasari, Diana (2022) ANALISIS KETERCAPAIAN PRODUKSI OVERBURDEN BULAN OKTOBER-DESEMBER 2021 DI PT ULIMA NITRA SITE PT DUTA BARA UTAMA, MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181823116.pdf] Text
RAMA_31201_03021181823116.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_TURNITIN.pdf] Text
RAMA_31201_03021181823116_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181823116_8864000016_0017048203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (743kB) | Preview
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_02.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (315kB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_03.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (199kB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_04.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (247kB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_05.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (31kB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_06_ref.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (155kB) | Request a copy
[thumbnail of RAMA_31201_03021181823116_8864000016_0017048203_07_lamp.pdf] Text
RAMA_31201_03021181823116_8864000016_0017048203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

In overburden stripping activity on October 2021 PT UN Site PT DBU plans to strip 161,927.66 BCM/month of overburden while the realization in the field is only 116,432.68 BCM/month or about 72% of the targeted production plan. One of the factors that resulted in not achieving the production target is the less than optimal performance of the tool and the many constraints that occur. So it is necessary to analyze the overburden production achievement at PT UN Site PT DBU. This research aimed to analyze the performance of digging and hauling equipment in overburden stripping activity, overburden stripping production achievements, constraints factor that effects overburden stripping production achievements, and to evaluate the effort to increase overburden stripping production achievements. This research observed the cycle time and work efficiency, so that the actual productivity of the digging and hauling equipment can be seen in the field. The result of this research showed that the productivity of digging and hauling equipment is 94,817 BCM/hour and 11,674 BCM/hour with production achievement of only 20%. The main factor that affects unattainability production is the low work efficiency of digging and hauling equipment, which are only 31% and 27%. There are 17 constraints that cause low work efficiency. The constraints that cause the biggest production losses are No Operator, No Dozer, Maintenance and Repair, Prepare Front Loading and Rain. Then an attempt was made to overcome the constraints that exist by eliminating or minimizing constraints that can be avoided so that the effective working time increases to 434,67 hours with a work efficiency of 60%. After evaluation, the production of digging and hauling equipment increased to 239.307,134 BCM/Month and 150.950,894 BCM/Month with a production achievement of 103%.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Productivity, Production, Overburden, Work Efficiency
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 23593 not found.
Date Deposited: 26 Aug 2022 02:46
Last Modified: 26 Aug 2022 02:46
URI: http://repository.unsri.ac.id/id/eprint/77823

Actions (login required)

View Item View Item