ATHALLAH, M. ZAKI and Toha, M. Taufik and Syarifudin, Syarifudin (2023) PERENCANAAN PENJADWALAN PENGERINGAN SUMP SERTA PENAMBANGAN DALAM UPAYA MENCAPAI TARGET FINALISASI PIT 1 TIMUR DAN UTARA DI TAHUN 2022 PT. BUKIT ASAM, TBK. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021181823017.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
|
Text
RAMA_31201_03021181823017_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (16MB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (580kB) |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (409kB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (194kB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (37kB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (159kB) | Request a copy |
|
Text
RAMA_31201_03021181823017_8864000016_0004097401_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
Abstract
PT. Bukit Asam, Tbk (PTBA) plans to carry out finalization activities on Pit 1 East and North. However, in the implementation of the East and North Pit 1 finalization activities there was an obstacle, namely the final design locations for East and North Pit 1 which based on the RKAP there were still 4 (four) sump that flooded, that is sump north, sump middle, sump south, and sump east so a draining plan is needed jump then a mining scheduling plan to achieve the finalization target pit in 2022. Based on calculations using Minescape 5.7 use tools sample - polygon, it is known the total reserves remaining on pit 1 East and North of 2,418,670.58 tons of coal by volume overburden of 5,381,828.51 BCM. Based on the drying scenario results sump which has been planned using the 7 available pump units, including 3 units of Multiflo 385 HP, 2 units of Multiflo 420 EXHV, 1 unit of KSB DND 200 MHX, 1 unit of KSB LSA, obtained a dry schedule sump middle on May 10, 2022, sump north on May 19, 2022, sump south on May 26, 2022, and sump east on June 14, 2022. After obtaining a dry schedule sump, then calculated plan production based on the capability of the available equipment with an estimate that all reserves will be exhausted in October 2022 so that a draft is obtained sequence mining on a monthly scale starting from May to October 2022 with a total of 652,492.14 tons and overburden of 2,622,230.14 BCM, SR 4.02:1 with an opening area of 32.29 ha and the final bench on RL -48 for Pit 1 North and to Pit 1 East obtained a total coal tonnage of 1,766,178.44 tons and overburden of 2,751,319.01 BCM, SR 1.56:1 with an opening area of 35.70 ha and the final bench at RL -50. Based on the results of the tool requirements analysis, for fleet overburden required 1 unit of Komatsu PC 2000 and 4 units of Liebherr R9100 paired with 29 units of Komatsu HD 785 in May to September 2022 and 2 units of Liebherr R9100 paired with 12 units of Komatsu HD 785 in October. Whereas for fleet coal, 4 units of Komatsu PC400 are needed paired with 28 units of Quester CWE 280 from May to October 2022. Based on the planned mining scheduling plan, a final schedule is obtained Pit 1 East and North with final schedule estimates Pit 1 North in September 2022 and Pit 1 East in October 2022.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Sequence, Penjadwalan Penambangan, Pengeringan Sump |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | M. Zaki Athallah |
Date Deposited: | 13 Apr 2023 07:14 |
Last Modified: | 13 Apr 2023 07:14 |
URI: | http://repository.unsri.ac.id/id/eprint/96082 |
Actions (login required)
View Item |