Items where Subject is "TH5011-5701 Construction by phase of the work (Building trades)"

Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 7.

Thesis

AL SAEKAN, ARIAGA HUSSIEN BAWAFI and Rosidawani, Rosidawani and Aminuddin, K. M. (2022) ANALISIS PENGELOLAAN PERAWATAN DAN PEMELIHARAAN ASPEK ARSITEKTUR PADA BEBERAPA BANGUNAN GEDUNG FAKULTAS TEKNIK UNIVERSITAS SRIWIJAYA. Undergraduate thesis, Sriwijaya University.

DINA, SHOFA FARAH and Juliantina, Ika and Rozirwan, Rozirwan (2013) TINJAUAN PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN BANK MANDIRI PALEMBANG. Undergraduate thesis, Sriwijaya University.

FEBRIKA, DIAN and Juliantina, Ika (2011) ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang). Undergraduate thesis, Sriwijaya University.

NASTITI, RIA INDAH and Sarino, Sarino and Toyfur, Mona Foralisa (2008) EVALUASI KINERJA PEMBANGUNAN SD- SMP SATU ATAP DENGAN PARTISIPASI MASYARAKAT DI SUMATERA SELATAN (STUDI KASUS : KABUPATEN MUSI KAWAS). Undergraduate thesis, Sriwijaya University.

RACHMAN, YONAS RAHADIAN and Idris, Yakni (2013) TINJAUAN PENGENDALIAN TENAGA KERJA PADA PROYEK PEMBANGUNAN DORMITORY SMA INTERNASIONAL SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

ROYTAMA, ANGGA and Jatmiko, Wirawan (2012) IDENTIFIKASI DAN ANALISIS FAKTOR FAKTOR DOMINAN YANG BERPENGARUH DALAM PENENTUAN PEMENANG LELANG JASA KONSTRUKSI (STUDI KASUS PADA DINAS PU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG). Undergraduate thesis, Sriwijaya University.

SILITONGA, DANK SAGEN and Aidi, M. Nizom and Lussetyowati, Tutur (2005) ANALISA PENGENDALIAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE CRITICAL PATH METHOD (STUDI KASUS PADA PROYEK PEMBANGUNAN PABRIK OBAT CEPHALOSPORIN PT. DEXA MEDICA PALEMBANG). Undergraduate thesis, Sriwijaya University.

This list was generated on Sun Dec 22 10:14:16 2024 WIB.