EVALUASI PRODUKTIVITAS COAL HANDLING FACILITY BATUBARA DI PT BUKIT ASAM TBK UNIT DERMAGA KERTAPATI, SUMATERA SELATAN

FIORENZA, FEBIELLA and Syarifuddin, Syarifuddin and Hadi, Alek Al (2023) EVALUASI PRODUKTIVITAS COAL HANDLING FACILITY BATUBARA DI PT BUKIT ASAM TBK UNIT DERMAGA KERTAPATI, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381924106.pdf] Text
RAMA_31201_03021381924106.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_TURNITIN.pdf] Text
RAMA_31201_03021381924106_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (4MB)
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_02.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_03.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_04.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_05.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (619kB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_06_ref.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (397kB) | Request a copy
[thumbnail of RAMA_31201_03021381924106_0004097401_0001069008_07_lamp.pdf] Text
RAMA_31201_03021381924106_0004097401_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

The coal handling facility process is a stage of unloading/moving coal transported by train for the next production stage to go to the barge. Coal is unloaded and spilled into the Apron feeder, from the Apron feeder to the barge using a belt conveyor. So that the flow of the coal handling facility consists of several equipment units including apron feeders, belt conveyors, magnetic separators, crushers, stackers and also shiploaders. After calculating the aktual productivity of the coal handling facility series system, the productivity of each tool is 584.57 tons/hour (apron feeder), 451.08 tons/hour (belt conveyor), 579.36 tons/hour (double roll crusher), 610 .04 ton/hour (stacker), 766.441 ton/hour (shiploader). Productivity obtained from the coal handling facility is 451.08 tons/hour following the smallest productivity data from the coal handling facility chain system. Based on the results of observations, the failure to achieve coal receiving-unloading was caused by a lack of trains coming to the Kertapati Jetty Unit which resulted in the failure to achieve coal production to barges. Therefore, if the supply of trains coming to PT Bukit Asam Tbk Kertapati Jetty Unit is sufficient or added, production will also increase.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: CHF, produktivitas, Target Produksi, Hambatan Produksi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Febiella Fiorenza
Date Deposited: 24 Jul 2023 03:00
Last Modified: 24 Jul 2023 03:04
URI: http://repository.unsri.ac.id/id/eprint/118872

Actions (login required)

View Item View Item