Items where Author is "Cahyaningsih, Bimbi"

Group by: Item Type | No Grouping
Number of items: 8.

KURNIAWAN, ALDI RIDHO and Waristian, Harry and Cahyaningsih, Bimbi (2024) PERENCANAAN SEKUEN PENAMBANGAN BATUBARA UNTUK MENINGKATKAN TARGET PRODUKSI MENJADI 2.000.000 METRIC TON PADA TAHUN 2024 DI PIT AB PT BUMI SEKUNDANG ENIM ENERGY, PENUKAL ABAB LEMATANG ILIR SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

FERIZAL, MUHAMMAD ALIF DAFFA and Gobel, Alieftiyani Paramita and Cahyaningsih, Bimbi (2024) EFEKTIVITAS METODE INJEKSI WASTE WATER TREATMENT PLANT DIBANDING METODE KONVENSIONAL DI PT POWERINDO KIMIA MINERAL JOBSITE PT BARA ANUGERAH SEJAHTERA. Undergraduate thesis, Sriwijaya University.

MAHARANI, ALVITA and Purbasari, Diana and Cahyaningsih, Bimbi (2024) STUDI OPTIMASI PIT DAN ESTIMASI CADANGAN BIJIH EMAS DI PT MINEVESTING RESOURCES INDONESIA JOBSITE PT. XYZ, KAB. MINAHASA TENGGARA, SULAWESI UTARA. Undergraduate thesis, Sriwijaya University.

JULARDI S, JONATHAN and Bochori, Bochori and Cahyaningsih, Bimbi (2024) EVALUASI GEOMETRI PELEDAKAN TERHADAP FRAGMENTASI HASIL PELEDAKAN LAPISAN INTERBURDEN B2-C DI PIT TSBC PT PAMAPERSADA NUSANTARA TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

SINAGA, GUNTUR LINTANG and Bochori, Bochori and Cahyaningsih, Bimbi (2024) PERENCANAAN DAN PENJADWALAN PENAMBANGAN AREA SHARING WALL DIANTARA DUA IUP DALAM RANGKA KONSERVASI CADANGAN BATUBARA, MUSI RAWAS UTARA, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

DAISIU, RICKY SEMUEL and Pebrianto, Rosihan and Cahyaningsih, Bimbi (2023) PENERAPAN METODE ALL WEATHER ROAD PADA JALAN POROS HAULING OVERBURDEN PIT ALAM 1-3 UNTUK MENINGKATKAN PRODUCTIVITY CMT 106 DI PT. BINA SARANA SUKSES SITE PT. MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

CHARTIN, NETHASA and Arief, Taufik and Cahyaningsih, Bimbi (2023) MODIFIKASI GEOMETRI PELEDAKAN UNTUK MENGURANGI BOULDER DI LOKASI PNBP LIMESTONE QUARRY BUKIT TAJARANG PUTIH PT SEMEN PADANG (PERSERO) TBK SUMATERA BARAT. Undergraduate thesis, Sriwijaya University.

ABRAHAM, WAYOI and Mukiat, Mukiat and Cahyaningsih, Bimbi (2023) EVALUASI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MEMENUHI TARGET PRODUKSI BATUBARA SEBESAR 4.000.000 TON/TAHUN DI PT. PUTRA MUBA COAL, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

This list was generated on Sun Dec 22 14:50:53 2024 WIB.