EVALUASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN PRODUKSI BATUBARA DI PIT 3 TIMUR SITE BANKO TENGAH PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

OKTAVIANSYAH, ADHE REYNALDI and Arief, A. Taufik and Suherman, Adang (2023) EVALUASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN PRODUKSI BATUBARA DI PIT 3 TIMUR SITE BANKO TENGAH PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924036.pdf] Text
RAMA_31201_03021281924036.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_TURNITIN.pdf] Text
RAMA_31201_03021281924036_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_01_front_ref.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_02.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (740kB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_03.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (909kB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_04.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_05.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (405kB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_06_ref.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (308kB) | Request a copy
[thumbnail of RAMA_31201_03021281924036_0009096303_0016035602_07_lamp.pdf] Text
RAMA_31201_03021281924036_0009096303_0016035602_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Bukit Asam Tbk has several contractors responsible for executing mining operations, one of which is PT Banguin Karya Pratama Leistari (BKPL), and PT Puisaka Buimi Transportasi (PBT) as subcontractors performing mining activities at Pit 3 East, Bangko Tengah site, with a production target of 100,000 tons of coal in March. This study aims to analyze the conditions of the mining work area, assess the production capabilities of loading and hauling equipment, and evaluate strategies to improve coal production at Pit 3 East, Bangko Tengah site. Mining is conducted using the open-pit method and employs the shovel and truck system. After calculations, the actual total coal production for the month of March amounted to 78.142,182 tons, achieving a production target of 78,14%. Based on this actual production, it is evident that the established production target has not been met. During coal mining activities, various obstacles were identified, including poor road conditions, ineffective working hours, and a lack of compatibility between loading and hauling equipment. Therefore, an evaluation was conducted regarding road conditions, work efficiency, and compatibility factors. The work efficiency in coal mining was increased from 39% to 47%. After a technical evaluation of coal mining activities, coal production increased from the initial 78.142,182 tons to 124.841,717 tons, achieving a production target of 124,84%, meeting the set production target for the month of March.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Produksi batubara, Efisiensi kerja, Jalan angkut, Match factor.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Adhe Reynaldi Oktaviansyah
Date Deposited: 16 Nov 2023 01:50
Last Modified: 16 Nov 2023 01:50
URI: http://repository.unsri.ac.id/id/eprint/130514

Actions (login required)

View Item View Item