EVALUASI POMPA SULZER 385 KW (ENGINE) SISTEM PENIRISAN TAMBANG DI MAIN SUMP PIT 1 BARAT BANKO BARAT PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM

LISTIANTY, HERDIANA NOVITA and Hasjim, Machmud and Arief, A. Taufik (2014) EVALUASI POMPA SULZER 385 KW (ENGINE) SISTEM PENIRISAN TAMBANG DI MAIN SUMP PIT 1 BARAT BANKO BARAT PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03091402042.pdf] Text
RAMA_31201_03091402042.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (54MB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_01_front_ref.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (13MB)
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_02.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_03.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_04.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_05.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_06.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (869kB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_07_ref.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_07_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (324kB) | Request a copy
[thumbnail of RAMA_31201_03091402042_8871510016_0009096303_08_lamp.pdf] Text
RAMA_31201_03091402042_8871510016_0009096303_08_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy

Abstract

PT. Bukit Asam (Persero) Tbk, mempunyai salah satu WIUP pit 1 Barat di Banko Barat. Secara umum lokasi tambang berada di daerah perbukitan, dengan elevasi main sump 26 mdpl. Sistem penambangan secara terbuka mengakibatkan adanya hubungan langsung dengan udara luar yaitu hujan. Pada bulan Juni air yang berada di dalam sump meluap dan akhirnya pemutusan hubungan kerja untuk subkontraktor PTBA. Keberadaan air hujan ini akan sangat mengganggu kegiatan penambangan sehingga air yang berada di sump harus dikeluarkan. Untuk evaluasi pit 1 barat BB curah hujan yang direncanakan 84,67 mm/hari dan intensitas 11,5 mm/jam menghasilkan debit limpasan 14.251,9 m3/jam, ditambah debit air tanah 3,6 m3/jam dan dikurangi evapotranspirasi 37,38 m3/jam dengan volume total air yang masuk perhari 56.197 m3. Untuk mengatasinya membiarkan air masuk dan ditampung oleh sump kemudian dipompakan dengan total head sebesar 43,8 meter, debit pompa 654 m3/jam, effisiensi pompa 78% dengan jam operasi pompa 21,482 jam. Sistem pemompaan ini menggunakan 4 unit pompa sulzer 385 K W (engine) yang diletakkan disump pit 1 barat. Maka volume sump yang direncanakan berdasarkan volume total air yang masuk per hari sebesar 56.197 m3 sebesar dengan dimensi sump yang baru 106 m x 106 m x 5 m sehingga mampu menampung air yang masuk perhari.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: curah hujan, pompa, sump
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 26 Apr 2024 07:29
Last Modified: 26 Apr 2024 07:29
URI: http://repository.unsri.ac.id/id/eprint/143475

Actions (login required)

View Item View Item